100 Wellington St W
Yonge-Bay Corridor · City of Toronto
546
Permits observed
Since 1985
1985
Active since
First filing: Jun 1985
Apr 29, 2026
Latest filing
—
1
Contractors involved
Across all filings
Permit timeline
Chronological history of commercial permits and filings.
-
26 137819 FSUBuilding New Build
Remove existing MPH fire and jockey pumps and 2 controllers.Supply and install new VIL electric fire pump 500gpm @ 65psi c/w fire pump controller (no transfer switch). Like for…
-
26 101295 MSA
Jan 20, 2026
Proposed addition of one (1) HVAC VAV into room.
Building AdditionProposed addition of one (1) HVAC VAV into room.
-
25 266883 BLDBuilding Renovation
Repair of Corroded Steel Lintel Beam above driveway opening at underground parking garage level P1
-
25 216975 FSUBuilding New Build
Replace the existing 500 GPM @ 65 PSI Fire Pump in the penthouse with a new 500GPM @ 65PSI Fire Pump and controller. The existing jockey pump in the penthouse will also be repla…
-
25 209678 HVABuilding Other
HVAC - Proposal for return to base and washrooms finishes update
-
25 209678 BLDBuilding Renovation
Proposal for return to base building shell for floors 11 and 20
-
25 238029 HVABuilding Renovation
HVAC - Proposal for interior alterations to renovate library and washroom area.
-
25 238029 PLBBuilding Renovation
Plumbing - Proposal for interior alterations to renovate library and washroom area.
View older filings (32)
-
25 238029 BLD
Proposal for interior alterations to renovate library and washroom area.
-
25 210657 FSU
Proposal for Pre-Action valve replacement in an existing commercial building.
-
25 219220 FSU
Installation of fire suppression system and pressure relief damper
-
25 189930 PLB
Plumbing - Proposal to interior alterations for office
-
25 189930 HVA
Jul 17, 2025
HVAC - Proposal to interior alterations for office
HVAC - Proposal to interior alterations for office
-
25 189930 BLD
Jul 10, 2025
Proposal to interior alterations for office
Proposal to interior alterations for office
-
25 114734 HVA
HVAC - Proposed interior alterations on the thirty-first floor of the west tower at the toronto-dominion centre.
-
25 114734 BLD
Proposed interior alterations on the thirty-first floor of the west tower at the toronto-dominion centre.
-
24 206501 BLD
Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
-
24 206501 HVA
HVAC - Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
-
24 206501 PLB
Plumbing - Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine, and Roof repair
-
24 235313 FSU
Proposal for replacing 2 fire pumps and sunction and discharge control valves and
-
24 175632 PSA
Aug 2, 2024
Backflow Replacement
Backflow Replacement
-
24 100993 HVA
Revision 02: Two additional roomsHVAC - Proposal for interior alterations to an existing Group D suite.
-
24 126874 PSA
Proposal for associated piping for the replacement of 2 existing HVAC units.See related building permit 23 219280 MSA.
-
24 100993 BLD
Revision 02: Two additional roomsProposal for interior alterations to an existing Group D suite.
-
24 121631 FSU
Connect to existing overhead sprinkler system to provide sprinkler coverage under existing obstruction (HVAC, piping) P1 level mechanical room
-
24 111218 PLB
Plumbing - Proposal to construct interior alterations for new tenant office suite.
-
24 111218 HVA
HVAC - Proposal to construct interior alterations for new tenant office suite.
-
24 111218 BLD
Proposal to construct interior alterations for new tenant office suite.
-
23 222796 MSA
ADDITION OF NEW PORTABLE AC UNIT WITH CONDENSATE PUMP
-
23 216687 HVA
HVAC - Proposal to construct interior alterations in Unit 63B.[includes kitchen exhaust hood]
-
23 219280 MSA
Nov 8, 2023
Replacement of 2 existing HVAC units
Replacement of 2 existing HVAC units
-
23 216687 PLB
Plumbing - Proposal to construct interior alterations in Unit 63B.
-
23 216687 BLD
Proposal to construct interior alterations in Unit 63B - concourse level[see HVA for kichen exhaust hood and fee]
-
23 137515 FSU
Flow Meter Supply/Installation. The scope of work is to install a flow meter and associated control valves on the discharge side of the Mechanical Penthouse Fire Pump to all the…
-
22 237965 FSU
Proposal to install total of six (6) maglocks 2 on each floor. 27, 29 & 30th floor. Please see drawing # E3.01, 3.02 & E3.03 on page # 5, 6 & 7 OF 9 of the attached drawings.
-
22 219644 HVA
HVAC - New partition wall and kitchen exhaust hood, Unit SW06 - Sultan's Mediterranean Grill
-
22 204093 PLB
Plumbing - Proposal for interior alterations to existing office space on floors 27, 29 and 30 - TD Bank Group
-
22 204093 HVA
HVAC - Proposal for interior alterations to existing office space on floors 27, 29 and 30 - TD Bank Group
-
22 204093 BLD
Proposal for interior alterations to existing offices on floor levels 27, 29 & 30 - 'TD Bank Group'. [TD West Tower 3]
-
22 219644 BLD
New partition wall and kitchen exhaust hood, Unit SW06 - Sultan's Mediterranean Grill -new tenant.
Activity continuity summary
546 commercial filings observed
Since 1985
Most filings were office-related
Tier 2 category mix
Recent activity visible across multiple years
Spans 1985–2026
Related contractors
-
MMFORM CONSTRUCTION GROUP INC
1 filing · Last active Dec 2022
Business emergence insights
Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.
Nearby related activity
- ↗ Commercial activity observed across Yonge-Bay Corridor.
- ↗ Multiple interior renovations in the surrounding blocks.
- ↗ Patio and signage activity consistent along the corridor.