Back to Winnipeg

1301 Kenaston Blvd

City of Winnipeg

5 permits
since 2013
Dec 13, 2023
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
  1. 2023

    1 filing
    View permits (1)
    1. Dec 13, 2023

      TUXEDO BUSINESS PARK INC

  2. 2019

    1 filing
    View permits (1)
    1. May 21, 2019

      Belle Fosh Signs

  3. 2017

    1 filing
    View permits (1)
    1. Jun 21, 2017

      Signex Manufacturing Inc

  4. 2013

    2 filings
    View permits (2)
    1. Feb 21, 2013

      Signex Manufacturing Inc

    2. Jan 31, 2013

      Terracon Development

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

10 locations shown

  • 1

    1313 Kenaston Boulevard

    New Build
    26 m
  • 2

    1325 Kenaston Blvd

    Renovation
    52 m
  • 3

    143 Nature Park Way

    Renovation
    66 m
  • 4

    15 Commerce Dr

    Renovation
    111 m
  • 5

    180 Nature Park Way

    New Build
    125 m
  • 6

    125 Nature Park Way

    New Build
    156 m
  • 7

    71 Commerce Dr

    Renovation
    162 m
  • 8

    2 addresses at this point

    Renovation ×2
    201 m
  • 9

    116 Nature Park Way

    Renovation
    232 m
  • 10

    2 addresses at this point

    New Build Renovation
    236 m
4

New Build

8

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

1301 Kenaston Blvd in Winnipeg has 5 building permits on record dating back to 2013, most recently on December 13, 2023.