16 Crimson Way
City of Winnipeg
- 2 permits
- since 2017
- Sep 10, 2025
- Most recent permit
Building permit timeline
Year-grouped permit history. Permits collapse under each year.
-
2025
1 filingView permits (1) Hide permits
-
2017
1 filingView permits (1) Hide permits
Active contractors at this address
Contractors who have filed permits at this address.
Nearby Construction
Within 250 mActive and recent construction within 250 m of this address.
20 locations shown
-
1
10 m
20 Crimson Way
Renovation -
2
39 m
27 Geneva Lane
New Build -
3
46 m
35 Geneva Lane
Renovation -
4
93 m
56 Crimson Way
New Build ×2 -
5
97 m
12 Geneva Lane
New Build -
6
109 m
40 Bow Water Drive
Renovation -
7
112 m
142 Evelyne Reese Boulevard
Renovation -
8
124 m
63 Crimson Way
Renovation -
9
135 m
57 Thelon Way
New Build -
10
154 m
41 Bow Water Drive
New Build -
11
162 m
158 Evelyne Reese Blvd
New Build -
12
183 m
57 Bow Water Dr
Renovation -
13
184 m
227 Bonaventure Drive W
Renovation ×2 -
14
187 m
281 Bonaventure Drive W
New Build -
15
191 m
61 Bow Water Dr
Renovation -
16
197 m
76 Thelon Way
Renovation -
17
203 m
82 Thelon Way
Renovation ×2 -
18
215 m
382 Bonaventure Drive W
New Build -
19
217 m
390 Bonaventure Dr W
Renovation -
20
232 m
199 Bonaventure Drive W Unit199
Renovation
New Build
Renovation
Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg
Nearby active addresses
Direct next steps for exploration.
-
35 Geneva Lane
46m1 recent · 3 total
1 filing in the last 12 months, latest May 2026
-
27 Geneva Lane
39m1 recent · 2 total
1 filing in the last 12 months, latest Feb 2026
-
12 Crimson Way
9m4 filings
Last filed Jul 2021
-
20 Crimson Way
10m3 filings
Last filed Apr 2025
-
28 Crimson Way
28m3 filings
Last filed Aug 2021
16 Crimson Way in Winnipeg has 2 building permits on record dating back to 2017, most recently on September 10, 2025.