Back to Winnipeg

18 Driftwater Trail

City of Winnipeg

3 permits
since 2015
Sep 20, 2024
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
  1. 2024

    1 filing
    View permits (1)
    1. Sep 20, 2024

  2. 2018

    1 filing
    View permits (1)
    1. Aug 10, 2018

  3. 2015

    1 filing
    View permits (1)
    1. Apr 20, 2015

      Touchwood Homes Inc

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

10 locations shown

  • 1

    43 Driftwater Trail

    Renovation
    93 m
  • 2

    54 Driftwater Trail

    Renovation
    103 m
  • 3

    298 Dr. Jose Rizal Way

    Renovation
    147 m
  • 4

    18 Greenfield Cove

    Renovation
    150 m
  • 5

    157 Kaur Umber Trail

    Renovation
    180 m
  • 6

    82 Driftwater Trail

    Renovation
    181 m
  • 7

    270 Dr. Jose Rizal Way

    Renovation
    195 m
  • 8

    262 Dr. Jose Rizal Way

    New Build Renovation
    216 m
  • 9

    51 Heronswood Path

    New Build
    227 m
  • 10

    146 Kaur Umber Trail

    Renovation
    240 m
2

New Build

9

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

18 Driftwater Trail in Winnipeg has 3 building permits on record dating back to 2015, most recently on September 20, 2024.