Back to Winnipeg

200 Bonaventure Dr E

City of Winnipeg

2 permits
since 2016
Aug 22, 2016
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2016
  1. 2016

    2 filings
    View permits (2)
    1. Aug 22, 2016

      KDR Design Builders Inc

    2. Mar 31, 2016

      KDR Design Builders Inc

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

12 locations shown

  • 1

    197 Bonaventure Drive E

    Renovation
    48 m
  • 2

    100 Bonaventure Drive E

    Renovation
    49 m
  • 3

    112 Bonaventure Drive E

    Renovation
    79 m
  • 4

    155 Bonaventure Dr E

    Renovation
    118 m
  • 5

    149 Bonaventure Drive E

    New Build
    121 m
  • 6

    76 Brian Monkman Bay

    Renovation
    123 m
  • 7

    240 Bonaventure Drive E

    Renovation
    135 m
  • 8

    44 Bonaventure Drive E

    Renovation
    150 m
  • 9

    41 Bonaventure Dr E

    New Build
    180 m
  • 10

    2 addresses at this point

    Renovation ×2
    204 m
  • 11

    29 Bonaventure Drive E

    Renovation ×2
    215 m
  • 12

    25 Bonaventure Dr E

    Renovation
    227 m
2

New Build

12

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

200 Bonaventure Dr E in Winnipeg has 2 building permits on record dating back to 2016, most recently on August 22, 2016.