Back to Winnipeg

223 Bonaventure Dr W

City of Winnipeg

2 permits
since 2018
Oct 21, 2020
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2018
2019
2020
  1. 2020

    1 filing
    View permits (1)
    1. Oct 21, 2020

  2. 2018

    1 filing
    View permits (1)
    1. Aug 22, 2018

      Qualico Developments (Winnipeg) Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

16 locations shown

  • 1

    227 Bonaventure Drive W

    Renovation ×2
    12 m
  • 2

    63 Crimson Way

    Renovation
    66 m
  • 3

    199 Bonaventure Drive W Unit199

    Renovation
    70 m
  • 4

    61 Bow Water Dr

    Renovation
    73 m
  • 5

    57 Bow Water Dr

    Renovation
    81 m
  • 6

    40 Bow Water Drive

    Renovation
    110 m
  • 7

    56 Crimson Way

    New Build ×2
    110 m
  • 8

    41 Bow Water Drive

    New Build
    124 m
  • 9

    20 Crimson Way

    Renovation
    180 m
  • 10

    281 Bonaventure Drive W

    New Build
    183 m
  • 11

    35 Geneva Lane

    Renovation
    189 m
  • 12

    16 Crimson Way

    New Build
    189 m
  • 13

    27 Geneva Lane

    New Build
    204 m
  • 14

    31 Montvale Crescent

    Renovation
    242 m
  • 15

    57 Thelon Way

    New Build
    249 m
  • 16

    2 addresses at this point

    New Build Renovation
    250 m
8

New Build

11

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

223 Bonaventure Dr W in Winnipeg has 2 building permits on record dating back to 2018, most recently on October 21, 2020.