Back to Winnipeg

28 Bow Water Dr

City of Winnipeg

3 permits
since 2017
Oct 21, 2019
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2017
2018
2019
  1. 2019

    1 filing
    View permits (1)
    1. Oct 21, 2019

  2. 2018

    1 filing
    View permits (1)
    1. Nov 27, 2018

      Kensington Homes Ltd

  3. 2017

    1 filing
    View permits (1)
    1. May 12, 2017

      Kensington Homes Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

19 locations shown

  • 1

    40 Bow Water Drive

    Renovation
    37 m
  • 2

    41 Bow Water Drive

    New Build
    66 m
  • 3

    20 Crimson Way

    Renovation
    88 m
  • 4

    16 Crimson Way

    New Build
    91 m
  • 5

    63 Crimson Way

    Renovation
    94 m
  • 6

    57 Bow Water Dr

    Renovation
    107 m
  • 7

    56 Crimson Way

    New Build ×2
    109 m
  • 8

    61 Bow Water Dr

    Renovation
    117 m
  • 9

    35 Geneva Lane

    Renovation
    127 m
  • 10

    27 Geneva Lane

    New Build
    128 m
  • 11

    227 Bonaventure Drive W

    Renovation ×2
    147 m
  • 12

    199 Bonaventure Drive W Unit199

    Renovation
    165 m
  • 13

    30 Bonaventure Dr W

    New Build
    171 m
  • 14

    12 Geneva Lane

    New Build
    188 m
  • 15

    142 Evelyne Reese Boulevard

    Renovation
    201 m
  • 16

    57 Thelon Way

    New Build
    218 m
  • 17

    2 addresses at this point

    New Build Renovation
    230 m
  • 18

    281 Bonaventure Drive W

    New Build
    231 m
  • 19

    38 Evelyne Reese Boulevard

    Renovation
    246 m
10

New Build

12

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

28 Bow Water Dr in Winnipeg has 3 building permits on record dating back to 2017, most recently on October 21, 2019.