28 Geneva Lane
City of Winnipeg
- 2 permits
- since 2018
- Jun 3, 2021
- Most recent permit
Building permit timeline
Year-grouped permit history. Permits collapse under each year.
-
2021
1 filingView permits (1) Hide permits
-
Jun 3, 2021
-
-
2018
1 filingView permits (1) Hide permits
Active contractors at this address
Contractors who have filed permits at this address.
Nearby Construction
Within 250 mActive and recent construction within 250 m of this address.
20 locations shown
-
1
37 m
12 Geneva Lane
New Build -
2
46 m
57 Thelon Way
New Build -
3
53 m
27 Geneva Lane
New Build -
4
54 m
35 Geneva Lane
Renovation -
5
73 m
142 Evelyne Reese Boulevard
Renovation -
6
92 m
16 Crimson Way
New Build -
7
93 m
20 Crimson Way
Renovation -
8
104 m
158 Evelyne Reese Blvd
New Build -
9
112 m
76 Thelon Way
Renovation -
10
120 m
82 Thelon Way
Renovation ×2 -
11
123 m
382 Bonaventure Drive W
New Build -
12
124 m
56 Crimson Way
New Build ×2 -
13
127 m
390 Bonaventure Dr W
Renovation -
14
145 m
281 Bonaventure Drive W
New Build -
15
176 m
63 Crimson Way
Renovation -
16
182 m
323 Bonaventure Dr W
Renovation -
17
188 m
40 Bow Water Drive
Renovation -
18
215 m
54 Wapta Cres
Renovation -
19
225 m
227 Bonaventure Drive W
Renovation ×2 -
20
238 m
41 Bow Water Drive
New Build
New Build
Renovation
Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg
Nearby active addresses
Direct next steps for exploration.
-
35 Geneva Lane
54m1 recent · 3 total
1 filing in the last 12 months, latest May 2026
-
27 Geneva Lane
53m1 recent · 2 total
1 filing in the last 12 months, latest Feb 2026
-
24 Geneva Lane
10m4 filings
Last filed Aug 2020
-
36 Geneva Lane
18m4 filings
Last filed Dec 2020
-
32 Geneva Lane
9m3 filings
Last filed Jul 2023
28 Geneva Lane in Winnipeg has 2 building permits on record dating back to 2018, most recently on June 3, 2021.