CanPermits
Back to Yonge-Bay Corridor

303 Bay St

Yonge-Bay Corridor · City of Toronto

17

Permits observed

Since 2004

2004

Active since

First filing: Jun 2004

Dec 5, 2022

Latest filing

0

Contractors involved

Across all filings

Permit timeline

Chronological history. Recent activity in the last 90 days is reserved for Premium.

  1. Building New Build

    FS - Sprinkler Shop Drawing - New rooftop solarium addition for existing private business club. The National club

  2. Building New Build

    Plumbing - New rooftop solarium enclosure for existing private business club. The National club

  3. Building New Build

    HVAC - New rooftop solarium enclosure for existing private business club. The National club

  4. Building New Build

    Revision 01 - Proposed changes bubbled.New rooftop solarium addition for existing private business club. The National club

  5. Building Renovation

    Plumbing - Proposal for interior alterations to level 4 and 5 to existing club.

  6. Building Renovation

    HVAC - Proposal for interior alterations to level 4 and 5 to existing club.

  7. Building Renovation

    Proposal for interior alterations to level 4 and 5 to existing club.

  8. Building Demolition

    Proposed interior demolition to second floor of existing club.

View older filings (9)
  1. Building

    Proposal to install back flow prevention device in the existing club.

  2. Building Renovation

    Plumbing - Proposal for interior alterations (10m2) and roof top patio to "The National Club"

  3. Building Renovation

    HVAC - Proposal for interior alterations (10m2) and roof top patio to "The National Club"

  4. Building Renovation

    Proposal for interior alterations (10m2) and roof top patio to "The National Club"

  5. Building New Build

    This is for the replacement of the existing fire alarm panel with a new fire alarm panel within the basement area of the "NATIONAL CLUB".

  6. Building Renovation

    Plumbing - Interior alterations to an existing club on the bsmt & ground Floor.

  7. Building Renovation

    HVAC - Interior alterations to an existing club on the bsmt, lower, ground, 2nd, 3rd, & 4th floor

  8. Building Demolition

    HVAC - Make interior alterations to entrance lobby; demolish concrete entrance stair at front elevation for barrier free lift. - Interior Alterations

  9. Building Demolition

    Make interior alterations to entrance lobby; demolish concrete entrance stair at front elevation for barrier free lift.

Activity continuity summary

17 commercial filings observed

Since 2004

Most filings were hvac-related

Tier 2 category mix

Recent activity visible across multiple years

Spans 2004–2022

Business emergence insights

Unlock emergence narrative, composition signals, continuity intelligence, and address cluster relationships.

Nearby related activity

Explore neighbourhood activity
  • Commercial activity observed across Yonge-Bay Corridor.
  • Multiple interior renovations in the surrounding blocks.
  • Patio and signage activity consistent along the corridor.