Back to Winnipeg

39 Bridge Lake Dr

City of Winnipeg

3 permits
since 2012
Jan 30, 2018
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2012
2013
2014
2015
2016
2017
2018
  1. 2018

    1 filing
    View permits (1)
    1. Jan 30, 2018

  2. 2015

    1 filing
    View permits (1)
    1. Sep 18, 2015

      Aqua-Tech Pools

  3. 2012

    1 filing
    View permits (1)
    1. Apr 18, 2012

      KDR Design Builders Inc

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

10 locations shown

  • 1

    47 Bridge Lake Dr

    New Build
    33 m
  • 2

    10 Birchleaf Point

    Renovation
    127 m
  • 3

    10 Clear Spring Road

    Renovation
    148 m
  • 4

    27 Bellflower Road

    Renovation
    155 m
  • 5

    62 Clear Spring Rd - Unit 62

    Renovation
    155 m
  • 6

    18 Birchleaf Pt

    Renovation
    171 m
  • 7

    31 Clear Spring Road

    Renovation
    172 m
  • 8

    34 Sablewood Road

    Renovation
    207 m
  • 9

    51 Bellflower Rd

    Renovation
    222 m
  • 10

    3 Willow Brook Road

    Renovation
    243 m
1

New Build

9

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

39 Bridge Lake Dr in Winnipeg has 3 building permits on record dating back to 2012, most recently on January 30, 2018.