Back to Winnipeg

41 Bow Water Dr

City of Winnipeg

1 permit
since 2021
Nov 26, 2021
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2021
  1. 2021

    1 filing
    View permits (1)
    1. Nov 26, 2021

      Home Scene Renovations

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

17 locations shown

  • 1

    41 Bow Water Drive

    New Build
    0 m
  • 2

    40 Bow Water Drive

    Renovation
    51 m
  • 3

    57 Bow Water Dr

    Renovation
    54 m
  • 4

    61 Bow Water Dr

    Renovation
    66 m
  • 5

    63 Crimson Way

    Renovation
    99 m
  • 6

    199 Bonaventure Drive W Unit199

    Renovation
    115 m
  • 7

    227 Bonaventure Drive W

    Renovation ×2
    129 m
  • 8

    56 Crimson Way

    New Build ×2
    141 m
  • 9

    30 Bonaventure Dr W

    New Build
    145 m
  • 10

    20 Crimson Way

    Renovation
    149 m
  • 11

    16 Crimson Way

    New Build
    154 m
  • 12

    2 addresses at this point

    New Build Renovation
    172 m
  • 13

    35 Geneva Lane

    Renovation
    183 m
  • 14

    27 Geneva Lane

    New Build
    188 m
  • 15

    38 Evelyne Reese Boulevard

    Renovation
    238 m
  • 16

    87 Bonaventure Dr W

    Renovation
    243 m
  • 17

    134 Ebb Tide Drive

    Renovation
    244 m
7

New Build

13

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

41 Bow Water Dr in Winnipeg has 1 building permit on record dating back to 2021, most recently on November 26, 2021.