Back to Winnipeg

48 Bow Water Dr

City of Winnipeg

2 permits
since 2017
Mar 20, 2017
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2017
  1. 2017

    2 filings
    View permits (2)
    1. Mar 20, 2017

      Gino's Construction Ltd

    2. Mar 17, 2017

      Gino's Construction Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

18 locations shown

  • 1

    40 Bow Water Drive

    Renovation
    25 m
  • 2

    63 Crimson Way

    Renovation
    43 m
  • 3

    41 Bow Water Drive

    New Build
    56 m
  • 4

    57 Bow Water Dr

    Renovation
    60 m
  • 5

    61 Bow Water Dr

    Renovation
    67 m
  • 6

    227 Bonaventure Drive W

    Renovation ×2
    86 m
  • 7

    56 Crimson Way

    New Build ×2
    87 m
  • 8

    199 Bonaventure Drive W Unit199

    Renovation
    109 m
  • 9

    20 Crimson Way

    Renovation
    117 m
  • 10

    16 Crimson Way

    New Build
    124 m
  • 11

    35 Geneva Lane

    Renovation
    142 m
  • 12

    27 Geneva Lane

    New Build
    151 m
  • 13

    30 Bonaventure Dr W

    New Build
    200 m
  • 14

    281 Bonaventure Drive W

    New Build
    203 m
  • 15

    12 Geneva Lane

    New Build
    214 m
  • 16

    2 addresses at this point

    New Build Renovation
    223 m
  • 17

    57 Thelon Way

    New Build
    224 m
  • 18

    142 Evelyne Reese Boulevard

    Renovation
    235 m
10

New Build

11

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

48 Bow Water Dr in Winnipeg has 2 building permits on record dating back to 2017, most recently on March 20, 2017.