Back to Winnipeg

560 Camiel Sys St

City of Winnipeg

7 permits
since 2013
Sep 2, 2025
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
  1. 2025

    2 filings
    View permits (2)
    1. Sep 2, 2025

      Jed Dessureault

    2. Jul 16, 2025

      Jed Dessureault

  2. 2024

    1 filing
    View permits (1)
    1. Apr 24, 2024

      South-Man Design Group Ltd

  3. 2018

    1 filing
    View permits (1)
    1. Sep 24, 2018

      Material Handling System of Canada

  4. 2014

    1 filing
    View permits (1)
    1. Mar 10, 2014

      Tower Engineering Group Inc

  5. 2013

    2 filings
    View permits (2)
    1. Nov 20, 2013

      Tower Engineering Group Inc

    2. Jul 8, 2013

      Stantec Architecture Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

4 locations shown

  • 1

    560 Camiel Sys Street

    Renovation ×2
    0 m
  • 2

    500 Camiel Sys Street

    New Build
    181 m
  • 3

    555 Camiel Sys St

    Renovation
    189 m
  • 4

    200 Beghin Ave

    Renovation
    195 m
1

New Build

4

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

560 Camiel Sys St in Winnipeg has 7 building permits on record dating back to 2013, most recently on September 2, 2025.