Back to Winnipeg

75 Scurfield Blvd Unit 8

City of Winnipeg

3 permits
since 2014
Aug 13, 2021
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2014
2015
2016
2017
2018
2019
2020
2021
  1. 2021

    1 filing
    View permits (1)
    1. Aug 13, 2021

      B2M Inc. o/a Fastsigns Winnipeg

  2. 2020

    1 filing
    View permits (1)
    1. Apr 16, 2020

      Foot by Foot Construction

  3. 2014

    1 filing
    View permits (1)
    1. Nov 7, 2014

      Nasta Construction

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

9 locations shown

  • 1

    30 Laurel Ridge Drive

    Renovation
    65 m
  • 2

    31 Laurel Ridge Drive

    Renovation
    119 m
  • 3

    2 addresses at this point

    Renovation ×2
    157 m
  • 4

    102 Scurfield Boulevard

    New Build
    212 m
  • 5

    550 Dovercourt Drive Unit 4

    New Build
    213 m
  • 6

    15 Ocean Ridge Dr

    New Build ×3
    216 m
  • 7

    11 Ocean Ridge Drive

    Renovation
    218 m
  • 8

    62 Scurfield Boulevard

    New Build
    220 m
  • 9

    2 addresses at this point

    New Build Renovation
    245 m
7

New Build

6

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

75 Scurfield Blvd Unit 8 in Winnipeg has 3 building permits on record dating back to 2014, most recently on August 13, 2021.