Back to Winnipeg

75 Villeneuve Blvd

City of Winnipeg

1 permit
since 2014
Sep 18, 2014
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2014
  1. 2014

    1 filing
    View permits (1)
    1. Sep 18, 2014

      FWC Basement Systems

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

13 locations shown

  • 1

    3485 Pembina Highway

    Renovation
    94 m
  • 2

    3487 Pembina Highway

    Renovation
    95 m
  • 3

    3491 & 3489 Pembina Highway

    Renovation
    97 m
  • 4

    3495 Pembina Highway

    Renovation ×2
    100 m
  • 5

    114 Villeneuve Boulevard

    Renovation
    161 m
  • 6

    3459 Pembina Highway

    Renovation
    162 m
  • 7

    55 Houde Drive

    Renovation ×2
    163 m
  • 8

    111 Houde Drive

    Renovation
    184 m
  • 9

    2 Villeneuve Boulevard Unit 2

    Renovation
    194 m
  • 10

    2 Villeneuve Boulevard Unit 3

    Renovation
    198 m
  • 11

    2 Villeneuve Boulevard Unit 1

    Renovation
    202 m
  • 12

    2 Villeneuve Boulevard Unit 4

    Renovation
    205 m
  • 13

    3514 Pembina Highway

    Renovation
    224 m
15

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

75 Villeneuve Blvd in Winnipeg has 1 building permit on record dating back to 2014, most recently on September 18, 2014.