Back to Winnipeg

84 Bonaventure Dr E

City of Winnipeg

2 permits
since 2016
May 19, 2017
Most recent permit

Building permit timeline

Year-grouped permit history. Permits collapse under each year.

2016
2017
  1. 2017

    1 filing
    View permits (1)
    1. May 19, 2017

  2. 2016

    1 filing
    View permits (1)
    1. Mar 24, 2016

      Ventura Custom Homes Ltd

Active contractors at this address

Contractors who have filed permits at this address.

Nearby Construction

Within 250 m

Active and recent construction within 250 m of this address.

13 locations shown

  • 1

    100 Bonaventure Drive E

    Renovation
    52 m
  • 2

    197 Bonaventure Drive E

    Renovation
    87 m
  • 3

    112 Bonaventure Drive E

    Renovation
    91 m
  • 4

    76 Brian Monkman Bay

    Renovation
    96 m
  • 5

    240 Bonaventure Drive E

    Renovation
    122 m
  • 6

    44 Bonaventure Drive E

    Renovation
    128 m
  • 7

    149 Bonaventure Drive E

    New Build
    141 m
  • 8

    155 Bonaventure Dr E

    Renovation
    142 m
  • 9

    41 Bonaventure Dr E

    New Build
    150 m
  • 10

    2 addresses at this point

    Renovation ×2
    175 m
  • 11

    29 Bonaventure Drive E

    Renovation ×2
    186 m
  • 12

    25 Bonaventure Dr E

    Renovation
    199 m
  • 13

    155 Henry Dormer Dr

    Renovation
    227 m
2

New Build

13

Renovation

Construction activity detected within 250 m, from the City of City of Winnipeg's open data. Each pin is a City-geocoded point (which may hold more than one record/address); click for details. Open data · City of Winnipeg

Nearby active addresses

Direct next steps for exploration.

84 Bonaventure Dr E in Winnipeg has 2 building permits on record dating back to 2016, most recently on May 19, 2017.