← Back to British Columbia
City of Vancouver Issued

1375 ODLUM DRIVE

Permit ID: DB-2019-03621

Full address : 1375 Odlum Dr, Vancouver, BC, Vancouver
Specialties
Electrical Roofing Windows & Doors Foundation / Structural
Issue Date
2020-03-02
Project Value
$400K
Project Type
Building Type
Neighbourhood
Grandview-Woodland
Description

High Density Housing / Commercial - Addition / Alteration - Exterior and Interior Alterations - To add approximately 196 sf at the rear and to demise this wholesaling - Class A (Group F2) into two units (Storage Warehouse at unit #110 & Storage Warehouse with ancillary Bulk Data Storage at unit #100) (Group F2) within common entry lobby and stairs in this existing 2 storey industrial building. Scope of work includes adding shared front entrance, accessible ramps at front and rear, and five rooftop units. Tenants: Fanatics at unit #110 & Zoic at unit #100 Note: 1. OK to process as DB for exterior alterations per Susan Chang. 2. One Loading - Class B relaxed by David Jung and Andrew Wroblewski on September 5, 2019. *****This permit has been reviewed under the 2014 Vancouver Building By-law (#10908).***** Revision 1: November 12, 2020: Remove one of the listed scope of work which calls to provide smoke detectors/alarm throughout the building. Revision #2: P Volpi, Dec. 11, 2020 Upper level: Reconfigure Stair #2, remove Windows W11 & W12, add Door D10, reduce Office, and adjust lighting layout. Lower level: Reconfigure Stair #2, remove non-structural partitions, increased shared area, decrease shared corridor width, reconfigure parking layout, rotate fire exit stair in loading bay, change storage room #4, remove storage room #5, adjust lighting layout, and change fire-rated Door 35 from a sliding door to a single door. Revision#3: Jan 12, 2023 - J. Chen - Change of applicant - Change of CRP from Soren Rasmusseri (architect) to Chester Machniewski, P.Eng. (structural engineer) - Add new electrical room and UPS room with 2HR FRR walls. - Installation of structural platform for cooling unit at rear of the building. - Installation of generators below the platform. - Installation of roof over loading bay which is considered as minor horizontal addition. Revision#4: Oct xx, 2025 - J. Chen - Change of applicant and architect. - Change wall type at electrical room to wood studs and drywall.

View Source Record

Contains information licensed under the Open Government Licence, City of Vancouver.

1375 Odlum Dr, Vancouver, BC, Vancouver

Show on map with nearby permits PRO

Project status (optional)

Owner or contractor on this project? Confirm here. Your real email stays hidden.

We don't verify identity or claim status. Listings are tentative and expire after 7 days.