In Fairview: 5 permits in the last 7 days · General-heavy . See area activity →
Field Review - Addition / Alteration - #500 - 5th floor Interior alterations to provide tenant improvements for a new office tenant on the 5th floor (#500) of this existing 6-storey commercial building. Scope of work: Move partition wall between reception and office #1, new flooring, replace existing t-bar ceiling, new kitchenette, new double swing doors, electrical, plumbing and sprinkler work. TENANT: Strategies 360 Ok For Field Review per Kim V - Apr 14/22 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: 1 @ E2 Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
1505 W 2nd Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PROOther permits at this address
Other work by BC Coastal Projects Ltd
View all →1505 W 2nd Ave, Vancouver, BC, Vancouver
Show on map with nearby permits PRO