Get emailed when we detect a status change on this permit.
Free for your first watch — no account needed. We'll email you a confirmation link; nothing is active until you click it.
Renovation permit
19 DUNCAN ST
Toronto , Ontario
- Issued
- Issued Sep 23, 2022
- Project type
- Renovation
- Status
- Issued
Activity at this address
27 permits since 1997
Most recent activity: Sep 2025
This permit is one of 27 permits filed at this address.
Revision history
2 revisions on file · 2019–2022
-
Revision issued Rev 01 Issued Sep 23, 2022
REV 01-DRAIN:M2.01 PARKADE LEVEL- P1- PLUMBING LAYOUTAdded Hot Water PRV on Retail Water for P Level WashroomsPicked up Grease Drain lines added form the level aboveUpdated sanitary routingAdded DHWR … Read full revision note Show less
REV 01-DRAIN:M2.01 PARKADE LEVEL- P1- PLUMBING LAYOUTAdded Hot Water PRV on Retail Water for P Level WashroomsPicked up Grease Drain lines added form the level aboveUpdated sanitary routingAdded DHWR line from retailM2.02 - BASEMENT - PLUMBING LAYOUTAdded Grease connection for future tenant useUpdated sanitary routingAdded DHWR line from retailDrain - Proposal to redevelop the site with a 58-storey mixed-use development including an nine-storey podium containing retail and office uses with 462 residential units in the tower portion. A total of 132 parking spaces and 523 bicycle parking spaces are located in 3 levels of below grade parking garage. The existing heritage building will be conserved.
-
Inspection Rev 00 Issued Jun 28, 2019
Drain - Proposal to redevelop the site with a 58-storey mixed-use development including an nine-storey podium containing retail and office uses with 462 residential units in the tower portion. A total… Read full revision note Show less
Drain - Proposal to redevelop the site with a 58-storey mixed-use development including an nine-storey podium containing retail and office uses with 462 residential units in the tower portion. A total of 132 parking spaces and 523 bicycle parking spaces are located in 3 levels of below grade parking garage. The existing heritage building will be conserved.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Sep 23, 2022
- Project value
- —
- Project type
- Renovation
- Building type
- Commercial
- Description
- REV 01-DRAIN:M2.01 PARKADE LEVEL- P1- PLUMBING LAYOUTAdded Hot Water PRV on Retail Water for P Level WashroomsPicked up Grease Drain lines added form the level aboveUpdated sanitary routingAdded DHWR line from retailM2.02 - BASEMENT - PLUMBING LAYOUTAdded Grease connection for future tenant useUpdated sanitary routingAdded DHWR line from retailDrain - Proposal to redevelop the site with a 58-storey mixed-use development including an nine-storey podium containing retail and office uses with 462 residential units in the tower portion. A total of 132 parking spaces and 523 bicycle parking spaces are located in 3 levels of below grade parking garage. The existing heritage building will be conserved.
- Builder name
- —
- Permit status
- Issued City's exact wording: Revision Issued
- Work type
- Drain and Site Service
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.