Renovation permit
49 DAVEAN DR
Toronto , Ontario
- Issued
- Issued Aug 23, 2016
- Project type
- Renovation
- Status
- Issued
Activity at this address
4 permits since 2016
Most recent activity: May 2020
This permit is one of 4 permits filed at this address.
Revision history
1 revision on file · 2016
-
Inspection Rev 00 Issued Aug 23, 2016
Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and fin… Read full revision note Show less
Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and finished basment (66.29m2)
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Aug 23, 2016
- Project value
- —
- Project type
- Renovation
- Building type
- Single Family
- Description
- Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and finished basment (66.29m2)
- Builder name
- —
- Permit status
- Issued City's exact wording: Inspection
- Work type
- Drain and Site Service
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.