Renovation permit

49 DAVEAN DR

Toronto , Ontario

Issued
Issued Aug 23, 2016
Project type
Renovation
Status
Issued

Activity at this address

4 permits since 2016

Most recent activity: May 2020

Renovation

This permit is one of 4 permits filed at this address.

3 2 1 0 2016 2020
See everything happening at this address · 4 permits
Permit No. 16 190459 DRN Currently issued

Revision history

1 revision on file · 2016

  1. Inspection Rev 00 Issued Aug 23, 2016
    Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and fin… Read full revision note

    Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and finished basment (66.29m2)

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Aug 23, 2016
Project value
Project type
Renovation
Building type
Single Family
Description
Install floor drains and MAINLINE FULLPORT backwater valve and sump pumpDrain - Construct a two storey rear adition (215.02m2) to the existing two storey house, interior alterations (132.58m2) and finished basment (66.29m2)
Builder name
Permit status
Issued City's exact wording: Inspection
Work type
Drain and Site Service
References & corrections IDs · source · attribution
Permit ID 16 190459 DRN
Full address 49 Davean Drive, Toronto, Ontario, M2L 2S1, Toronto, M2L 2S1
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.