Demolition permit
65 DUNDAS ST E
Toronto , Ontario
- Issued
- Issued Dec 21, 2022
- Project type
- Demolition
- Status
- Issued
Activity at this address
11 permits since 2010
Most recent activity: May 2024
This permit is one of 11 permits filed at this address.
Revision history
4 revisions on file · 2022–2025
-
Revision issued Rev 03 Issued Oct 27, 2025
Revision 3 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
-
Revision issued Rev 02 Issued Jul 15, 2025
REVISION - The MUA on the roof was not captured properly in the previous BPHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction t… Read full revision note Show less
REVISION - The MUA on the roof was not captured properly in the previous BPHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
-
Revision issued Rev 01 Issued May 13, 2025
Revision 01 - Revision 2 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel t… Read full revision note Show less
Revision 01 - Revision 2 - Updated kitchen designHVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
-
Inspection Rev 00 Issued Dec 21, 2022
HVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Dec 21, 2022
- Project value
- —
- Project type
- Demolition
- Building type
- —
- Commercial category
- Hospitality
- Description
- HVAC - PHASE 1 - Basement Level 02 to Level 7Proposal for interior demolition to prepare for change of use and construction to convert existing hotel to affordable housing.
- Builder name
- —
- Permit status
- Issued City's exact wording: Inspection
- Work type
- Mechanical(MS)
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.