Addition permit
73 SORAUREN AVE
Toronto , Ontario
- Issued
- Issued Jan 05, 2026
- Project type
- Addition
- Status
- Issued
Activity at this address
3 permits since 2026
Most recent activity: Apr 2026
This permit is one of 3 permits filed at this address.
Revision history
1 revision on file · 2026
-
Permit issued Rev 00 Issued Jan 05, 2026
HVAC - The scope of work includes both interior and exterior alterations, specifically modifying the third-floor suites (which are currently vacant due to the TFC concerns) to provide two means of egr… Read full revision note Show less
HVAC - The scope of work includes both interior and exterior alterations, specifically modifying the third-floor suites (which are currently vacant due to the TFC concerns) to provide two means of egress. Additionally, an exterior stair is proposed on the south side of the building to facilitate safe and compliant exiting from each suite providing two means of egress.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Jan 05, 2026
- Project value
- —
- Project type
- Addition
- Building type
- Multi Family
- Description
- HVAC - The scope of work includes both interior and exterior alterations, specifically modifying the third-floor suites (which are currently vacant due to the TFC concerns) to provide two means of egress. Additionally, an exterior stair is proposed on the south side of the building to facilitate safe and compliant exiting from each suite providing two means of egress.
- Permit status
- Issued City's exact wording: Permit Issued
- Work type
- Mechanical(MS)
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.