New Build permit
150 COLLEGE ST
Toronto , Ontario
- Issued
- Issued Dec 22, 2025
- Project type
- New Build
- Value
- $875K
- Status
- Issued
Activity at this address
386 permits since 1995
Most recent activity: Jun 2026
This permit is one of 386 permits filed at this address.
Revision history
3 revisions on file · 2025–2026
-
Application received Rev 01 Applied Jun 15, 2026
REV01: Proposed revisions for teaching lab, quiet room and level 8 & 9Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of … Read full revision note Show less
REV01: Proposed revisions for teaching lab, quiet room and level 8 & 9Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical wires, plumbing, and mechanical fume hoods. The scope also includes adding new finishes, new FRR doors, new bulkheads, new electrical receptacles, stabilizing the existing masonry walls, adding a condensing unit and a return fan. Furthermore, abatement and new fire spray will be part of stabilizing the walls.
-
Permit issued Rev 00 Issued Dec 22, 2025
Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical … Read full revision note Show less
Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical wires, plumbing, and mechanical fume hoods. The scope also includes adding new finishes, new FRR doors, new bulkheads, new electrical receptacles, stabilizing the existing masonry walls, adding a condensing unit and a return fan. Furthermore, abatement and new fire spray will be part of stabilizing the walls.
-
Inspection Rev 00 Issued Dec 22, 2025
Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical … Read full revision note Show less
Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical wires, plumbing, and mechanical fume hoods. The scope also includes adding new finishes, new FRR doors, new bulkheads, new electrical receptacles, stabilizing the existing masonry walls, adding a condensing unit and a return fan. Furthermore, abatement and new fire spray will be part of stabilizing the walls.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Dec 22, 2025
- Project value
- $875K
- Project type
- New Build
- Building type
- —
- Commercial category
- Institutional
- Description
- Proposed interior alteration to renovate spaces 5334, 5326, 5326B and demolish 5334A, 5334B,5326A on the 5th floor. The extent of the renovation includes removing finishes, removing walls, electrical wires, plumbing, and mechanical fume hoods. The scope also includes adding new finishes, new FRR doors, new bulkheads, new electrical receptacles, stabilizing the existing masonry walls, adding a condensing unit and a return fan. Furthermore, abatement and new fire spray will be part of stabilizing the walls.
- Builder name
- —
- Permit status
- Issued City's exact wording: Inspection
- Work type
- Building Additions/Alterations
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.