New Build permit
44 ST JOSEPH ST
Toronto , Ontario
- Issued
- Issued Apr 29, 2009
- Project type
- New Build
- Status
- Completed
Activity at this address
16 permits since 2002
Most recent activity: Jul 2023
This permit is one of 16 permits filed at this address.
Revision history
2 revisions on file · 2009
-
Closed - Dormant Rev 00 Issued Apr 29, 2009
HVAC - Proposal to alter existing ceiling within the ground floor condominium lobby area to add a lightcove and alter the ceiling design for an architectural cove as well. Also, there will be some mar… Read full revision note Show less
HVAC - Proposal to alter existing ceiling within the ground floor condominium lobby area to add a lightcove and alter the ceiling design for an architectural cove as well. Also, there will be some marble slab construction at the front entrance to the lobby for new marble wall cladding and a new marble curb. This proposal inlcudes HVAC.
-
Permit issued Rev 00 Issued Apr 29, 2009
HVAC - Proposal to alter existing ceiling within the ground floor condominium lobby area to add a lightcove and alter the ceiling design for an architectural cove as well. Also, there will be some mar… Read full revision note Show less
HVAC - Proposal to alter existing ceiling within the ground floor condominium lobby area to add a lightcove and alter the ceiling design for an architectural cove as well. Also, there will be some marble slab construction at the front entrance to the lobby for new marble wall cladding and a new marble curb. This proposal inlcudes HVAC.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Apr 29, 2009
- Project value
- —
- Project type
- New Build
- Building type
- Multi Family
- Description
- HVAC - Proposal to alter existing ceiling within the ground floor condominium lobby area to add a lightcove and alter the ceiling design for an architectural cove as well. Also, there will be some marble slab construction at the front entrance to the lobby for new marble wall cladding and a new marble curb. This proposal inlcudes HVAC.
- Builder name
- —
- Permit status
- Completed City's exact wording: Closed - Dormant
- Work type
- Mechanical(MS)
- Completed
- 2026-06-08
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.