Demolition permit

50 BLOOR ST W

Toronto , Ontario

Issued
Issued Nov 09, 2018
Project type
Demolition
Status
Completed

Activity at this address

315 permits since 1995

Most recent activity: Jun 2026

Retail

This permit is one of 315 permits filed at this address.

60 40 20 0 2019 2020 2021 2022 2023 2024 2025 2026
See everything happening at this address · 315 permits
Permit No. 18 133836 BLD Currently completed

Revision history

4 revisions on file · 2018

  1. Closed Rev 03 Issued Nov 09, 2018
    REV03:Amendment includes structural cross bracing removal and replacement with alternate structure.Rev 02: Electrical drawingsRev 01: Amendment includes additional scope to finishes, additional lighti… Read full revision note

    REV03:Amendment includes structural cross bracing removal and replacement with alternate structure.Rev 02: Electrical drawingsRev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition of fire hose cabinets and sprinkler heads. Includes minor interior alteration.

  2. Closed Rev 02 Issued Jul 16, 2018
    Rev 02: Electrical drawingsRev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back … Read full revision note

    Rev 02: Electrical drawingsRev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition of fire hose cabinets and sprinkler heads. Includes minor interior alteration.

  3. Closed Rev 01 Issued Jun 08, 2018
    Rev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condit… Read full revision note

    Rev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition of fire hose cabinets and sprinkler heads. Includes minor interior alteration.

  4. Closed Rev 00 Issued Apr 24, 2018
    Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition o… Read full revision note

    Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition of fire hose cabinets and sprinkler heads. Includes minor interior alteration.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Nov 09, 2018
Project value
Project type
Demolition
Building type
Commercial
Commercial category
Retail
Description
REV03:Amendment includes structural cross bracing removal and replacement with alternate structure.Rev 02: Electrical drawingsRev 01: Amendment includes additional scope to finishes, additional lighting, proposal of fixture locationsOrig: Proposal for selective area at 50 Bloor (Holt Renfrew) back to the base building condition involving demolition of selected pre-existing non-loadbearing partitions & related re-alignment, & addition of fire hose cabinets and sprinkler heads. Includes minor interior alteration.
Permit status
Completed City's exact wording: Closed
Work type
Building Additions/Alterations
Completed
2019-01-24
References & corrections IDs · source · attribution
Permit ID 18 133836 BLD
Full address 50 Bloor Street West, Toronto, Ontario, M4W 1A3, Toronto, M4W 1A3
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.