New Build permit

29 CHESTER AVE

Toronto , Ontario

Issued
Issued Aug 28, 2019
Project type
New Build
Status
Completed

Activity at this address

4 permits since 2018

Most recent activity: Aug 2019

Institutional

This permit is one of 4 permits filed at this address.

3 2 1 0 2018 2019
See everything happening at this address · 4 permits
Permit No. 17 205291 BLD Currently completed

Revision history

4 revisions on file · 2018–2019

  1. Closed Rev 03 Issued Aug 28, 2019
    Rev 03: Revision for modification and addition to the existing standpipe systemREVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave … Read full revision note

    Rev 03: Revision for modification and addition to the existing standpipe systemREVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).

  2. Closed Rev 02 Issued Aug 22, 2018
    Rev 02: Revision for shoring permit.REVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an a… Read full revision note

    Rev 02: Revision for shoring permit.REVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).

  3. Closed Rev 01 Issued Aug 22, 2018
    REVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-gra… Read full revision note

    REVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).

  4. Closed Rev 00 Issued Apr 05, 2018
    Proposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include … Read full revision note

    Proposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Aug 28, 2019
Project value
Project type
New Build
Building type
Commercial category
Institutional
Description
Rev 03: Revision for modification and addition to the existing standpipe systemREVISION - as per the bubbled drawingsProposal to alter the existing public transit building (which spans 22 Chester Ave and 29-31 Chester Ave) by constructing an addition above the existing below-grade portion. The addition will include a new entrance above grade, with storage/utility areas below grade and access stairs leading to/from the existing below grade portion of the building (platform level).
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Building Additions/Alterations
Completed
2021-04-20
References & corrections IDs · source · attribution
Permit ID 17 205291 BLD
Full address 29 Chester Avenue, Toronto, Ontario, M4K 2X5, Toronto, M4K 2X5
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.