New Build permit
66 JUTLAND RD
Toronto , Ontario
- Issued
- Issued Jun 21, 2023
- Project type
- New Build
- Status
- Completed
Activity at this address
84 permits since 2008
Most recent activity: Mar 2026
This permit is one of 84 permits filed at this address.
Revision history
4 revisions on file · 2020–2023
-
Closed Rev 03 Issued Jun 21, 2023
REVISION 03: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, … Read full revision note Show less
REVISION 03: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. HVAC Permit Revision for 19 247847 HVA 02 MSRevision 02: The submission is to reflect the second set of revisions to the 19-247847 HVA 01 MS for Block A. The mechanical revisions since last permit submisssion are made on the roof plan & subgrade plan (see M101A drawing), main servicies (see M102A drawing), equipment schedules (see M801A drawings), and additional equipment schedules changes (See M802A drawing). Additional of shower and bike lockers on basement level.
-
Closed Rev 02 Issued Apr 01, 2022
REVISION 03 :The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, … Read full revision note Show less
REVISION 03 :The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. Revision 02: The submission is to reflect the second set of revisions to the 19-247847 HVA 01 MS for Block A. The mechanical revisions since last permit submisssion are made on the roof plan & subgrade plan (see M101A drawing), main servicies (see M102A drawing), equipment schedules (see M801A drawings), and additional equipment schedules changes (See M802A drawing). Additional of shower and bike lockers on basement level.
-
Closed Rev 01 Issued Oct 26, 2021
Revision 01: reflect change of mechanical systems, to support the construction of a 1 storey underground structure.
-
Closed Rev 00 Issued Jun 04, 2020
HVAC - The proposed development consists of 58 2-storey industrial/office units within 5 blocks with a total GFA of 11,523 square meters. A vehicular entrance is proposed on the south east side of the… Read full revision note Show less
HVAC - The proposed development consists of 58 2-storey industrial/office units within 5 blocks with a total GFA of 11,523 square meters. A vehicular entrance is proposed on the south east side of the site with ingress and egress from Jutland Road. Block A consists of 16 units.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Jun 21, 2023
- Project value
- —
- Project type
- New Build
- Building type
- Industrial
- Commercial category
- Industrial
- Description
- REVISION 03: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. HVAC Permit Revision for 19 247847 HVA 02 MSRevision 02: The submission is to reflect the second set of revisions to the 19-247847 HVA 01 MS for Block A. The mechanical revisions since last permit submisssion are made on the roof plan & subgrade plan (see M101A drawing), main servicies (see M102A drawing), equipment schedules (see M801A drawings), and additional equipment schedules changes (See M802A drawing). Additional of shower and bike lockers on basement level.
- Permit status
- Completed City's exact wording: Closed
- Work type
- Mechanical(MS)
- Completed
- 2023-11-20
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.