New Build permit

123 EASTSIDE DR

Toronto , Ontario

Issued
Issued Jan 11, 2023
Project type
New Build
Status
Completed

Activity at this address

33 permits since 2017

Most recent activity: Nov 2025

Warehouse

This permit is one of 33 permits filed at this address.

12 8 4 0 2017 2018 2020 2021 2022 2023 2024 2025
See everything happening at this address · 33 permits
Permit No. 20 166439 HVA Currently completed

Revision history

3 revisions on file · 2021–2023

  1. Closed Rev 02 Issued Jan 11, 2023
    Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof… Read full revision note

    Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof, exhaust from existing RO room to be diverted from within building to outside with a roof penetration, chiller room ventilation system included with refrigerant leak detection system tied into exhaust fan (EF-18) control. Chiller room complete with outdoor air makeup duct, control sequence for chiller room exhaust provided, supplemental cooling in chiller room provided by air conditioning unit AC-9, new round 10" exhaust duct from waste water equipment to terminate above roof, lab exhaust to combine in a plenum that connects to the roof mounted exhaust fan, new air valves provided on exhaust branches to help maintain balanced airflow in the QC labRevision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.

  2. Closed Rev 01 Issued Feb 08, 2022
    Revision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations … Read full revision note

    Revision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.

  3. Closed Rev 00 Issued Jan 19, 2021
    HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area a… Read full revision note

    HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Jan 11, 2023
Project value
Project type
New Build
Building type
Industrial
Commercial category
Warehouse
Description
Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof, exhaust from existing RO room to be diverted from within building to outside with a roof penetration, chiller room ventilation system included with refrigerant leak detection system tied into exhaust fan (EF-18) control. Chiller room complete with outdoor air makeup duct, control sequence for chiller room exhaust provided, supplemental cooling in chiller room provided by air conditioning unit AC-9, new round 10" exhaust duct from waste water equipment to terminate above roof, lab exhaust to combine in a plenum that connects to the roof mounted exhaust fan, new air valves provided on exhaust branches to help maintain balanced airflow in the QC labRevision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Mechanical(MS)
Completed
2023-07-26
References & corrections IDs · source · attribution
Permit ID 20 166439 HVA
Full address 123 Eastside Drive, Toronto, Ontario, M8Z 5X1, Toronto, M8Z 5X1
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.