New Build permit
123 EASTSIDE DR
Toronto , Ontario
- Issued
- Issued Jan 11, 2023
- Project type
- New Build
- Status
- Completed
Activity at this address
33 permits since 2017
Most recent activity: Nov 2025
This permit is one of 33 permits filed at this address.
Revision history
3 revisions on file · 2021–2023
-
Closed Rev 02 Issued Jan 11, 2023
Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof… Read full revision note Show less
Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof, exhaust from existing RO room to be diverted from within building to outside with a roof penetration, chiller room ventilation system included with refrigerant leak detection system tied into exhaust fan (EF-18) control. Chiller room complete with outdoor air makeup duct, control sequence for chiller room exhaust provided, supplemental cooling in chiller room provided by air conditioning unit AC-9, new round 10" exhaust duct from waste water equipment to terminate above roof, lab exhaust to combine in a plenum that connects to the roof mounted exhaust fan, new air valves provided on exhaust branches to help maintain balanced airflow in the QC labRevision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.
-
Closed Rev 01 Issued Feb 08, 2022
Revision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations … Read full revision note Show less
Revision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.
-
Closed Rev 00 Issued Jan 19, 2021
HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area a… Read full revision note Show less
HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Jan 11, 2023
- Project value
- —
- Project type
- New Build
- Building type
- Industrial
- Commercial category
- Warehouse
- Description
- Rev 02 - Unit heater UH-1 installed in process chiller room to help maintain an adequate room temperature. Unit heater complete with flue vent and combustion air pipes that penetrates through the roof, exhaust from existing RO room to be diverted from within building to outside with a roof penetration, chiller room ventilation system included with refrigerant leak detection system tied into exhaust fan (EF-18) control. Chiller room complete with outdoor air makeup duct, control sequence for chiller room exhaust provided, supplemental cooling in chiller room provided by air conditioning unit AC-9, new round 10" exhaust duct from waste water equipment to terminate above roof, lab exhaust to combine in a plenum that connects to the roof mounted exhaust fan, new air valves provided on exhaust branches to help maintain balanced airflow in the QC labRevision 01 - Addition of a new Quality Assurance/Quality Control laboratory at the north west corner of Unit 4 and other changes as mentioned in the cover letter.HVAC - Proposed interior alterations to increase size of cafeteria and locker room, new washrooms, new vestibules, new offices, meeting rooms new maintenance rooms, new bottle filing and tubing area and a new first aid room in unit 5, to existing rooms in unit 4 and a new washrooms in unit 6 of an existing Skin Care Manufacturing and Storage Facility.
- Builder name
- —
- Permit status
- Completed City's exact wording: Closed
- Work type
- Mechanical(MS)
- Completed
- 2023-07-26
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.