New Build permit

357 BAY ST

Toronto , Ontario

Issued
Issued Nov 03, 2020
Project type
New Build
Status
Completed

Activity at this address

19 permits since 1997

Most recent activity: Nov 2020

Office

This permit is one of 19 permits filed at this address.

9 6 3 0 1997 2011 2014 2018 2020
See everything happening at this address · 19 permits
Permit No. 20 154955 HVA Currently completed

Revision history

2 revisions on file · 2020–2022

  1. Closed Rev 01 Issued Aug 08, 2022
    Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitHVAC - PROPOSED: Floors… Read full revision note

    Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitHVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D) AND CONFERENCE/PRESENTATION ASSEMBLY SPACE (GROUP A2)Base building work done under #18 256994 BA

  2. Closed Rev 00 Issued Nov 03, 2020
    HVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WAS… Read full revision note

    HVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D) AND CONFERENCE/PRESENTATION ASSEMBLY SPACE (GROUP A2)Base building work done under #18 256994 BA

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Nov 03, 2020
Project value
Project type
New Build
Building type
Commercial
Commercial category
Retail
Description
HVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW WASHROOMS INCLUDING PLUMBING AND FIXTURES, NEW LIGHTING. REINSTATEMENT OF OPENING IN 2M FLOOR WITH ASSOCIATED STRUCTURAL WORK, 2HR FRR BETWEEN 2&2M FLOORS MAINTAINED WITH 2HR FRR GWB PARTITIONS AND FIRE SHUTTERS. CHANGE OF USE AT GROUND FLOOR FROM RETAIL (GROUP E) TO OFFICES (GROUP D) AND CONFERENCE/PRESENTATION ASSEMBLY SPACE (GROUP A2)Base building work done under #18 256994 BA
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Mechanical(MS)
Completed
2024-02-12
References & corrections IDs · source · attribution
Permit ID 20 154955 HVA
Full address 357 Bay Street, Toronto, Ontario, M5H 2T7, Toronto, M5H 2T7
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.