Addition permit
100 POPLAR PLAINS RD
Toronto , Ontario
- Issued
- Issued Dec 27, 2023
- Project type
- Addition
- Status
- Completed
Activity at this address
9 permits since 2002
Most recent activity: Dec 2023
This permit is one of 9 permits filed at this address.
Revision history
3 revisions on file · 2022–2023
-
Closed Rev 02 Issued Dec 27, 2023
Rev 02:- Due to the client's decision to intrdouce high velocity air handling system to the overall mechanical HVAC design - HVAC design has been revised Revision 01 - Due to the assembly and minor la… Read full revision note Show less
Rev 02:- Due to the client's decision to intrdouce high velocity air handling system to the overall mechanical HVAC design - HVAC design has been revised Revision 01 - Due to the assembly and minor layout changes mechanical HVAC design has been updated as a response to the overall design revision.HVAC - Proposal to alter the existing 2-storey semi-detached dwelling by constructing: a rear ground floor deck, rear 1-storey addition, a partial third storey additition and a roof terrace at third at 3rd storey.
-
Closed Rev 01 Issued Jan 20, 2023
Revision 01 - Due to the assembly and minor layout changes mechanical HVAC design has been updated as a response to the overall design revision.HVAC - Proposal to alter the existing 2-storey semi-deta… Read full revision note Show less
Revision 01 - Due to the assembly and minor layout changes mechanical HVAC design has been updated as a response to the overall design revision.HVAC - Proposal to alter the existing 2-storey semi-detached dwelling by constructing: a rear ground floor deck, rear 1-storey addition, a partial third storey additition and a roof terrace at third at 3rd storey.
-
Closed Rev 00 Issued Sep 29, 2022
HVAC - Proposal to alter the existing 2-storey semi-detached dwelling by constructing: a rear ground floor deck, rear 1-storey addition, a partial third storey additition and a roof terrace at third at 3rd storey.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Dec 27, 2023
- Project value
- —
- Project type
- Addition
- Building type
- Single Family
- Description
- Rev 02:- Due to the client's decision to intrdouce high velocity air handling system to the overall mechanical HVAC design - HVAC design has been revised Revision 01 - Due to the assembly and minor layout changes mechanical HVAC design has been updated as a response to the overall design revision.HVAC - Proposal to alter the existing 2-storey semi-detached dwelling by constructing: a rear ground floor deck, rear 1-storey addition, a partial third storey additition and a roof terrace at third at 3rd storey.
- Permit status
- Completed City's exact wording: Closed
- Work type
- Mechanical(MS)
- Completed
- 2024-05-13
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.