New Build permit
125 THE QUEENSWAY
Toronto , Ontario
- Issued
- Issued Sep 23, 2021
- Project type
- New Build
- Status
- Completed
Activity at this address
123 permits since 2003
Most recent activity: Nov 2025
This permit is one of 123 permits filed at this address.
Revision history
1 revision on file · 2021
-
Closed Rev 00 Issued Sep 23, 2021
HVAC - Proposal for base building fit-ups including replacing an existing roof top unit and adding a second roof top unit. Remove existing leasehold improvements including ceiling, internal non-struct… Read full revision note Show less
HVAC - Proposal for base building fit-ups including replacing an existing roof top unit and adding a second roof top unit. Remove existing leasehold improvements including ceiling, internal non-structural walls & floor coverings. Electrical: new 400AMP, 120/208V, 3PH service c/w 400 AMP main breaker and 200 AMP branch circuit Panel. HVAC: one new 3 ton RTU and replace existing 6.5 ton RTU with 7.5 ton RTU c/w with all utility connections. Plumbing: New 1.25" water service. Structural New Rooftop opening for new 3 ton unit and modify existing opening. New roof opening for a MUA and exhaust fan.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Sep 23, 2021
- Project value
- —
- Project type
- New Build
- Building type
- Commercial
- Commercial category
- Retail
- Description
- HVAC - Proposal for base building fit-ups including replacing an existing roof top unit and adding a second roof top unit. Remove existing leasehold improvements including ceiling, internal non-structural walls & floor coverings. Electrical: new 400AMP, 120/208V, 3PH service c/w 400 AMP main breaker and 200 AMP branch circuit Panel. HVAC: one new 3 ton RTU and replace existing 6.5 ton RTU with 7.5 ton RTU c/w with all utility connections. Plumbing: New 1.25" water service. Structural New Rooftop opening for new 3 ton unit and modify existing opening. New roof opening for a MUA and exhaust fan.
- Permit status
- Completed City's exact wording: Closed
- Work type
- Mechanical(MS)
- Completed
- 2021-10-07
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.