New Build permit
47 AUSTIN TER
Toronto , Ontario
- Issued
- Issued Feb 21, 2025
- Project type
- New Build
- Status
- Completed
Activity at this address
17 permits since 2013
Most recent activity: Mar 2026
This permit is one of 17 permits filed at this address.
Revision history
3 revisions on file · 2022–2025
-
Closed Rev 02 Issued Feb 21, 2025
REVISION 02: revision proposal regarding the incoming domestic water pipe revised from a 100ø combined fire and water pipe to new 100ø incoming domestic water service pipe and 150ø incoming fire servi… Read full revision note Show less
REVISION 02: revision proposal regarding the incoming domestic water pipe revised from a 100ø combined fire and water pipe to new 100ø incoming domestic water service pipe and 150ø incoming fire service pipe to the building main as shown in drawing M100 Site PlanREVISION 01: -Plumbing and drainage riser replacements to be de-scoped and remain as existing up to 4th floor slab -Please review if the building can keep new Flush Valve toilets (purchased and on site) on level 4 by upsizing 19Ø DCW riser to 25Ø on the level 4 take-off to meet the 25Ø minimum DCW pipe size requirement-Building can install 1 Flush Valve toilet on 4th floor to show operation Plumbing - Proposal for interior alterations on all levels in the existing hospital.-Heating boiler plant replacement, including domestic hot water-Emergency generator replacement, including demolition of existing generators-Fire Sprinkler system retrofit to add sprinkler coverage for all above grade levels.-Interior renovations on all levels, including architectural, HVAC, plumbing and electrical-Exterior Landscape renovations
-
Closed Rev 01 Issued Jan 05, 2024
REVISION 01: -Plumbing and drainage riser replacements to be de-scoped and remain as existing up to 4th floor slab -Please review if the building can keep new Flush Valve toilets (purchased and on sit… Read full revision note Show less
REVISION 01: -Plumbing and drainage riser replacements to be de-scoped and remain as existing up to 4th floor slab -Please review if the building can keep new Flush Valve toilets (purchased and on site) on level 4 by upsizing 19Ø DCW riser to 25Ø on the level 4 take-off to meet the 25Ø minimum DCW pipe size requirement-Building can install 1 Flush Valve toilet on 4th floor to show operation Plumbing - Proposal for interior alterations on all levels in the existing hospital.-Heating boiler plant replacement, including domestic hot water-Emergency generator replacement, including demolition of existing generators-Fire Sprinkler system retrofit to add sprinkler coverage for all above grade levels.-Interior renovations on all levels, including architectural, HVAC, plumbing and electrical-Exterior Landscape renovations
-
Closed Rev 00 Issued Oct 21, 2022
Plumbing - Proposal for interior alterations on all levels in the existing hospital.-Heating boiler plant replacement, including domestic hot water-Emergency generator replacement, including demolitio… Read full revision note Show less
Plumbing - Proposal for interior alterations on all levels in the existing hospital.-Heating boiler plant replacement, including domestic hot water-Emergency generator replacement, including demolition of existing generators-Fire Sprinkler system retrofit to add sprinkler coverage for all above grade levels.-Interior renovations on all levels, including architectural, HVAC, plumbing and electrical-Exterior Landscape renovations
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Feb 21, 2025
- Project value
- —
- Project type
- New Build
- Building type
- Institutional
- Commercial category
- Institutional
- Description
- REVISION 02: revision proposal regarding the incoming domestic water pipe revised from a 100ø combined fire and water pipe to new 100ø incoming domestic water service pipe and 150ø incoming fire service pipe to the building main as shown in drawing M100 Site PlanREVISION 01: -Plumbing and drainage riser replacements to be de-scoped and remain as existing up to 4th floor slab -Please review if the building can keep new Flush Valve toilets (purchased and on site) on level 4 by upsizing 19Ø DCW riser to 25Ø on the level 4 take-off to meet the 25Ø minimum DCW pipe size requirement-Building can install 1 Flush Valve toilet on 4th floor to show operation Plumbing - Proposal for interior alterations on all levels in the existing hospital.-Heating boiler plant replacement, including domestic hot water-Emergency generator replacement, including demolition of existing generators-Fire Sprinkler system retrofit to add sprinkler coverage for all above grade levels.-Interior renovations on all levels, including architectural, HVAC, plumbing and electrical-Exterior Landscape renovations
- Builder name
- —
- Permit status
- Completed City's exact wording: Closed
- Work type
- Plumbing(PS)
- Completed
- 2025-11-27
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.