New Build permit
333 BERING AVE
Toronto , Ontario
- Issued
- Issued Feb 18, 2020
- Project type
- New Build
- Status
- Completed
Activity at this address
6 permits since 2020
Most recent activity: May 2022
This permit is one of 6 permits filed at this address.
Revision history
5 revisions on file · 2011–2021
-
Closed Rev 04 Issued Nov 25, 2021
REVISION 04.- 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprinkler… Read full revision note Show less
REVISION 04.- 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprinklered and the service equipment does not constitute a fire hazard.2. Sink and shower door has been added in Suite 100 on Level 23. Kitchens have been removed from Meeting Rooms 300, 400, 500 and 600 on Level 3.4. Washroom has been reconfigured in Suite 700 on Level 3.clarify the main domestic cold water service connection to the existing water servicePlumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
-
Closed Rev 02 Issued Dec 17, 2020
Rev 02 - Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space int… Read full revision note Show less
Rev 02 - Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Plumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
-
Cancelled Rev 03 Closed Nov 26, 2020
REVISION - clarify the main domestic cold water service connection to the existing water servicePlumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground f… Read full revision note Show less
REVISION - clarify the main domestic cold water service connection to the existing water servicePlumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
-
Closed Rev 01 Issued Feb 18, 2020
Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Plumbing - Remove part of the east ground floor for (8) new … Read full revision note Show less
Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Plumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
-
Closed Rev 00 Issued Aug 11, 2011
Plumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Feb 18, 2020
- Project value
- —
- Project type
- New Build
- Building type
- Commercial
- Commercial category
- Office
- Description
- Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Plumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New fixtures and rough-ins.
- Builder name
- —
- Permit status
- Completed City's exact wording: Closed
- Work type
- Plumbing(PS)
- Completed
- 2022-02-03
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.