Renovation permit
85 RICHMOND ST W
Toronto , Ontario
- Issued
- Issued Aug 28, 2019
- Project type
- Renovation
- Status
- Completed
Activity at this address
110 permits since 2001
Most recent activity: Jun 2026
This permit is one of 110 permits filed at this address.
Revision history
3 revisions on file · 2019–2020
-
Closed Rev 02 Issued Sep 18, 2020
Revision #2 - Changes to include detail of the 2nd floor sump-pump.Plumbing - Revision #1:Amendment to Permit 19 198109 BLD 00 BA, to include Level 2 at 85 Richmond Street West. Permit 19 198109 BLD 0… Read full revision note Show less
Revision #2 - Changes to include detail of the 2nd floor sump-pump.Plumbing - Revision #1:Amendment to Permit 19 198109 BLD 00 BA, to include Level 2 at 85 Richmond Street West. Permit 19 198109 BLD 00 BA has previously been issued for Levels 6 through 11 at 85 Richmond Street West. Interior tenant alterations for tenant on 6th, 7th, 8th, 9th, 10th and 11th floor. Scope includes erection of non-load-bearing partitions, the re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are existing to remain.
-
Closed Rev 01 Issued Dec 10, 2019
Plumbing - Revision #1:Amendment to Permit 19 198109 BLD 00 BA, to include Level 2 at 85 Richmond Street West. Permit 19 198109 BLD 00 BA has previously been issued for Levels 6 through 11 at 85 Richm… Read full revision note Show less
Plumbing - Revision #1:Amendment to Permit 19 198109 BLD 00 BA, to include Level 2 at 85 Richmond Street West. Permit 19 198109 BLD 00 BA has previously been issued for Levels 6 through 11 at 85 Richmond Street West. Interior tenant alterations for tenant on 6th, 7th, 8th, 9th, 10th and 11th floor. Scope includes erection of non-load-bearing partitions, the re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are existing to remain.
-
Closed Rev 00 Issued Aug 28, 2019
Plumbing - Interior tenant alterations for tenant on 6th, 7th, 8th, 9th, 10th and 11th floor. Scope includes erection of non-load-bearing partitions, the re-alignment and redistribution of electrical,… Read full revision note Show less
Plumbing - Interior tenant alterations for tenant on 6th, 7th, 8th, 9th, 10th and 11th floor. Scope includes erection of non-load-bearing partitions, the re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are existing to remain.
Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.
Permit details
The municipal record for this permit.
- Issue date
- Aug 28, 2019
- Project value
- —
- Project type
- Renovation
- Building type
- Commercial
- Commercial category
- Office
- Description
- Plumbing - Interior tenant alterations for tenant on 6th, 7th, 8th, 9th, 10th and 11th floor. Scope includes erection of non-load-bearing partitions, the re-alignment and redistribution of electrical, mechanical and life safety systems. Area is existing and egress locations are existing to remain.
- Permit status
- Completed City's exact wording: Closed
- Work type
- Plumbing(PS)
- Completed
- 2020-09-22
References & corrections IDs · source · attribution
Contains information licensed under the Open Government Licence, City of Toronto.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.