New Build permit

112 COLLEGE ST

Toronto , Ontario

Issued
Issued Mar 31, 2025
Project type
New Build
Status
Completed

Activity at this address

36 permits since 2001

Most recent activity: Jun 2026

Institutional

This permit is one of 36 permits filed at this address.

9 6 3 0 2015 2019 2020 2021 2023 2024 2025 2026
See everything happening at this address · 36 permits
Permit No. 25 126581 PLB Currently completed

Revision history

1 revision on file · 2025

  1. Closed Rev 00 Issued Mar 31, 2025
    Plumbing - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two op… Read full revision note

    Plumbing - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electrical and lighting work will be tied back to existing base building systems. Existing sprinkler system inside suite to be revised to suit new interior layout. Existing structure is to remain with no change.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Mar 31, 2025
Project value
Project type
New Build
Building type
Commercial
Commercial category
Office
Description
Plumbing - Proposed work is an interior office fit-out inside suite 610 on the existing 6th Floor of the Schwartz Reisman Innovation Campus West Tower. The program of the proposed work includes two open workstation areas, a meeting room, a private breakout room, two private offices, a kitchen with dining area, a reception area, two storage areas, and space to accommodate existing private pods. New plumbing work for the kitchen is being proposed. New HVAC work to serve this office suite is being proposed. New electrical and lighting work are being proposed. All proposed HVAC, plumbing, electrical and lighting work will be tied back to existing base building systems. Existing sprinkler system inside suite to be revised to suit new interior layout. Existing structure is to remain with no change.
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Plumbing(PS)
Completed
2025-08-08
References & corrections IDs · source · attribution
Permit ID 25 126581 PLB
Full address 112 College Street, Toronto, Ontario, M5G 1X6, Toronto, M5G 1X6