New Build permit

15 DALE AVE

Toronto , Ontario

Issued
Issued Jan 22, 2020
Project type
New Build
Status
Completed

Activity at this address

3 permits since 2018

Most recent activity: Apr 2020

Addition

This permit is one of 3 permits filed at this address.

3 2 1 0 2018 2020
See everything happening at this address · 3 permits
Permit No. 18 139078 BLD Currently completed

Revision history

4 revisions on file · 2018–2020

  1. Closed Rev 03 Issued Jan 22, 2020
    Rev #3: Changes to roof layout, include rough-ins. Rev #2: Changes to add a new basement kitchen to be used in conjunction with the main house, not a new unit.Rev. #1: Changes as per bubbled drawings,… Read full revision note

    Rev #3: Changes to roof layout, include rough-ins. Rev #2: Changes to add a new basement kitchen to be used in conjunction with the main house, not a new unit.Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glazingProposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, basement walkout, front canopy, attached garage and roof terrace.

  2. Closed Rev 02 Issued Sep 09, 2019
    Rev #2: Changes to add a new basement kitchen to be used in conjunction with the main house, not a new unit.Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glaz… Read full revision note

    Rev #2: Changes to add a new basement kitchen to be used in conjunction with the main house, not a new unit.Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glazingProposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, basement walkout, front canopy, attached garage and roof terrace.

  3. Closed Rev 01 Issued Nov 08, 2018
    Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glazingProposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, ba… Read full revision note

    Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glazingProposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, basement walkout, front canopy, attached garage and roof terrace.

  4. Closed Rev 00 Issued May 15, 2018

    Proposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, basement walkout, front canopy, attached garage and roof terrace.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Jan 22, 2020
Project value
Project type
New Build
Building type
Single Family
Description
Rev #3: Changes to roof layout, include rough-ins. Rev #2: Changes to add a new basement kitchen to be used in conjunction with the main house, not a new unit.Rev. #1: Changes as per bubbled drawings, change from fire rated windows to sprinklered glazingProposed basement alterations, interior alterations, rear 2 storey addition, side 2nd storey addition, basement walkout, front canopy, attached garage and roof terrace.
Permit status
Completed City's exact wording: Closed
Work type
Small Residential Projects
Completed
2023-07-06
References & corrections IDs · source · attribution
Permit ID 18 139078 BLD
Full address 15 Dale Avenue, Toronto, Ontario, M4W 1K2, Toronto, M4W 1K2
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.