New Build permit

152 CAMPBELL AVE

Toronto , Ontario

Issued
Issued Apr 30, 2010
Project type
New Build
Status
Completed

Activity at this address

4 permits since 2010

Most recent activity: Aug 2010

New Build

This permit is one of 4 permits filed at this address.

6 4 2 0 2010
See everything happening at this address · 4 permits
Permit No. 09 123658 BLD Currently completed

Revision history

3 revisions on file · 2009–2010

  1. Closed Rev 02 Issued Apr 30, 2010
    SECOND REVISION TO BUILDING PERMIT - REVISION TO INSULATION DRAWINGS AND VB. Nov 12/09: Revision to building permit (See revision clouds on drawing) Dwelling to remain as SFD. Proposal for interior al… Read full revision note

    SECOND REVISION TO BUILDING PERMIT - REVISION TO INSULATION DRAWINGS AND VB. Nov 12/09: Revision to building permit (See revision clouds on drawing) Dwelling to remain as SFD. Proposal for interior alterations to change existing single family dwelling into a two unit converted house. The construction is to include a new bay window at the front, new concrete steps leading into unit 1 located at the ground floor, a new window will be added to the basement, basement underpinning, a new basement walkout will be provided for unit 2. Also, interior alterations to all the floors and the sunroom at the front to be removed. Unit 1 will be on the ground floor and the second floor and unit 2 will be in the basement. See previous PAL folder no. 09 123658 BLD.

  2. Closed Rev 01 Issued Nov 30, 2009
    Nov 12/09: Revision to building permit (See revision clouds on drawing) Dwelling to remain as SFD. Proposal for interior alterations to change existing single family dwelling into a two unit converted… Read full revision note

    Nov 12/09: Revision to building permit (See revision clouds on drawing) Dwelling to remain as SFD. Proposal for interior alterations to change existing single family dwelling into a two unit converted house. The construction is to include a new bay window at the front, new concrete steps leading into unit 1 located at the ground floor, a new window will be added to the basement, basement underpinning, a new basement walkout will be provided for unit 2. Also, interior alterations to all the floors and the sunroom at the front to be removed. Unit 1 will be on the ground floor and the second floor and unit 2 will be in the basement. See previous PAL folder no. 09 123658 BLD.

  3. Closed Rev 00 Issued Apr 22, 2009
    Proposal for interior alterations to change existing single family dwelling into a two unit converted house. The construction is to include a new bay window at the front, new concrete steps leading in… Read full revision note

    Proposal for interior alterations to change existing single family dwelling into a two unit converted house. The construction is to include a new bay window at the front, new concrete steps leading into unit 1 located at the ground floor, a new window will be added to the basement, basement underpinning, a new basement walkout will be provided for unit 2. Also, interior alterations to all the floors and the sunroom at the front to be removed. Unit 1 will be on the ground floor and the second floor and unit 2 will be in the basement. See previous PAL folder no. 09 123658 BLD.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Apr 30, 2010
Project value
Project type
New Build
Building type
Single Family
Description
SECOND REVISION TO BUILDING PERMIT - REVISION TO INSULATION DRAWINGS AND VB. Nov 12/09: Revision to building permit (See revision clouds on drawing) Dwelling to remain as SFD. Proposal for interior alterations to change existing single family dwelling into a two unit converted house. The construction is to include a new bay window at the front, new concrete steps leading into unit 1 located at the ground floor, a new window will be added to the basement, basement underpinning, a new basement walkout will be provided for unit 2. Also, interior alterations to all the floors and the sunroom at the front to be removed. Unit 1 will be on the ground floor and the second floor and unit 2 will be in the basement. See previous PAL folder no. 09 123658 BLD.
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Small Residential Projects
Completed
2010-09-15
References & corrections IDs · source · attribution
Permit ID 09 123658 BLD
Full address 152 Campbell Avenue, Toronto, Ontario, M6P 3N4, Toronto, M6P 3N4
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.