New Build permit

9 BALLANTYNE CRT

Toronto , Ontario

Issued
Issued Jan 07, 2013
Project type
New Build
Status
Completed

Activity at this address

3 permits since 2012

Most recent activity: Jan 2013

Addition

This permit is one of 3 permits filed at this address.

3 2 1 0 2012 2013
See everything happening at this address · 3 permits
Permit No. 12 108399 HVA Currently completed

Revision history

2 revisions on file · 2012–2013

  1. Closed Rev 01 Issued Jan 07, 2013
    Revision 01 - changing from forced warm air system to high velocity for main source of heat and infloor heating for basement. (HVAC - Proposed construction of a (1) storey side yard addition which inc… Read full revision note

    Revision 01 - changing from forced warm air system to high velocity for main source of heat and infloor heating for basement. (HVAC - Proposed construction of a (1) storey side yard addition which includes an attached garage, interior alterations, finished basement, front yard covered porch, remove and replace roof and underpin existing basement footings to an existing (1) storey detachd single family dwelling. New HVAC system)

  2. Closed Rev 00 Issued Jun 08, 2012
    HVAC - Proposed construction of a (1) storey side yard addition which includes an attached garage, interior alterations, finished basement, front yard covered porch, remove and replace roof and underp… Read full revision note

    HVAC - Proposed construction of a (1) storey side yard addition which includes an attached garage, interior alterations, finished basement, front yard covered porch, remove and replace roof and underpin existing basement footings to an existing (1) storey detachd single family dwelling. New HVAC system

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Jan 07, 2013
Project value
Project type
New Build
Building type
Single Family
Description
Revision 01 - changing from forced warm air system to high velocity for main source of heat and infloor heating for basement. (HVAC - Proposed construction of a (1) storey side yard addition which includes an attached garage, interior alterations, finished basement, front yard covered porch, remove and replace roof and underpin existing basement footings to an existing (1) storey detachd single family dwelling. New HVAC system)
Permit status
Completed City's exact wording: Closed
Work type
Mechanical(MS)
Completed
2013-11-29
References & corrections IDs · source · attribution
Permit ID 12 108399 HVA
Full address 9 Ballantyne Court, Toronto, Ontario, M9B 2K6, Toronto, M9B 2K6
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.