Renovation permit

650 W 41ST AVENUE

Vancouver , British Columbia

Issued
Issued Jan 04, 2019
Project type
Renovation
Value
$45.0M
Status
Issued

Activity at this address

161 permits since 2017

Most recent activity: May 2026

Renovation

This permit is one of 161 permits filed at this address.

54 36 18 0 2019 2020 2021 2022 2023 2024 2025 2026
See everything happening at this address · 161 permits

Permit details

The municipal record for this permit.

Issue date
Jan 04, 2019
Project value
$45.0M
Project type
Renovation
Building type
Commercial
Commercial category
Retail
Description
Certified Professional Program - Addition / Alteration - Enabling works Interior and exterior alterations to the existing mall including: - reconfiguration of mall corridors; - reconfiguration of parking and loading spaces/access on Level P1; - new exit stairs at required locations for exiting; - relocation of a portion of the existing food court; and - addition of a temporary entrance along Cambie Street. The grease interceptor has been removed from this Building Permit application and will be submitted as part of the Tenant Improvement application. Revision 1 (issued July 18, 2019) includes: -change of project architect/CRP -structural scope by Glotman Simpson -Geotechnical scope by GeoPacific -changes to floor plans. Revision 2 (issued Oct.22, 2019) includes: -revision to structural shear walls -revision to CRU demising -revision to extent of roof area identified for restricted vehicular access and snow removal -penetrations for food hall tenant intake and exhaust -deletion of kitchen exhaust fan KEF-1. Revision 3 (issued December 17, 2019): base building revision to accommodate Presentation Centre shell space for future tenant improvement (Level P1 and Level 1). Revision 4: interior modification limited to CRU #443 to provide shell space for a temporary presentation centre. Revision 5: to re-occupy CRUs #452 and #463, revise parkade vestibule in Zone 1 Level 1 and delete temporary protection deck and supports in Zone 2 Level 1. Change of engineer of record (building envelope). Alan Bowden replaced Brian Hubbs as off January 22, 2020. Change of GC: PCL will be replaced by Ellis Don. Effective January 27, 2020, Ellis Don has taken over demolition of the North Parkade. Revision 6: relocation of an existing catch basin, installation of a sump pump and routing of existing sanitary lines, force main and vent piping. Revision 7: revision to mall corridor (level 1) to accommodate the separation and demolition and Phase I North structure.
Permit status
Issued
Applicant
David Steer DBA: LMDG Building Code Consultants Ltd.
References & corrections IDs · source · attribution
Permit ID BP-2018-04741
Full address 650 W 41st Ave, Vancouver, BC, Vancouver, V5Z 2M9
Page URL

Contains information licensed under the Open Government Licence, City of Vancouver.

Nearby active addresses

Other addresses with recent permit activity near this permit.