New Build permit

1961 TOLMIE STREET

Vancouver , British Columbia

Issued
Issued May 29, 2019
Project type
New Build
Value
$1.4M
Status
Issued

Activity at this address

3 permits since 2018

Most recent activity: May 2019

Demolition

This permit is one of 3 permits filed at this address.

3 2 1 0 2018 2019
See everything happening at this address · 3 permits

Permit details

The municipal record for this permit.

Issue date
May 29, 2019
Project value
$1.4M
Project type
New Build
Building type
Single Family
Description
Low Density Housing - New Building - To construct a 2 storey one-family dwelling (1,428,697.50) with a detached accessory building (garage) at the rear providing 3 parking spaces, having vehicular access from the lane. Note: This is a 2 storey building pursuant to the Zoning and Development By-Law Note: The entire building, INCLUDING THE ATTACHED GARAGE, to be sprinklered to NFPA 13D. Note: All rooms with unprotected openings, including closet and bathrooms, to be sprinklered Address Note: 1961 TOLMIE STREET- cellar, 1st and 2nd storey (principal dwelling unit) Address has been assigned per the approved plans. This access must be provided and maintained at all times and the building addresses posted to be visible from the street in accordance with the Building By-law. 1.\tNo Covenant required 2.\tNo Secondary suite proposed 3.\tNo strata titling permitted 4.\tBar/sink proposed at the rec room on cellar 5.\tA/C unit proposed at the rear 6.\tARC & STR ALLISON DENTOOM 604-762-7844 GEO - GEOFFREY G. DYER 604-770-0355 7.\tHPO - Adisa Homes Ltd 8. Drawings are not perforated. (Please, look for accepted stamp) 9. Thermal exclusion has been applied ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2014****** "Combustible projections or roof soffits on an exposing building face shall not project to less than .45m from the property line and shall be in compliance with VBBL 2014 9.10.15.5.(9)" Any alterations or conversions to the attached garage (if applicable) to habitable living space shall not be permitted without first obtaining the approval of the Director of Planning and the Chief Building Official. Thermal protection measures and Laneway house design guidelines shall be required to be met prior to the approval of the conversion.
Contractor
Adisa Homes Ltd
Permit status
Issued
Applicant
Nigel Parish DBA: Splyce Design
References & corrections IDs · source · attribution
Permit ID DB-2018-00116
Full address 1961 Tolmie St, Vancouver, BC, Vancouver, V6R
Page URL

Contains information licensed under the Open Government Licence, City of Vancouver.

Nearby active addresses

Other addresses with recent permit activity near this permit.

More from Adisa Homes Ltd

View contractor profile

5 other permits on record.