Renovation permit
2337 TURNER STREET
Vancouver , British Columbia
- Issued
- Issued Jan 20, 2020
- Project type
- Renovation
- Value
- $65K
- Status
- Issued
Activity at this address
1 permit since 2020
Most recent activity: Jan 2020
Renovation
This permit is one of 1 permit filed at this address.
Permit details
The municipal record for this permit.
- Issue date
- Jan 20, 2020
- Project value
- $65K
- Project type
- Renovation
- Building type
- Single Family
- Description
- Field Review - Addition / Alteration - Interior alterations to repair sub floor and framing at 2337 on the 1st floor of this existing one family dwelling with secondary suite. Okay for Field Review per M. Lee Structural and or Geo-technical Schedule B may be required and will be determined by DBI on site. Scope of work as identified on page 2 of 3 includes: 1) Removal of rotten sub-floor and framing. 2) Application of liquid membrane to the foundation wall. 3) Installation of new sub-floor and re-installation of kitchen. 4) Drywall repairs as needed and paint. ****slab topping only. no slab removal or geo peng required as house is on peat bog**** Scope of work does not include layout changes on the 1st floor OR any work to the principal dwelling unit located on the 2nd floor. REUP prepared by: Peter Moffat (Homestep.ca) 604.812.8304 EnerGuide File #: 14Z3D00041
- Contractor
- Factory Edge Construction Ltd
- Permit status
- Issued
- Applicant
- Hugh Fairfield
References & corrections IDs · source · attribution
Permit ID
BP-2019-05301
Full address
2337 Turner St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from Factory Edge Construction Ltd
14 other permits on record.