Renovation permit
730 BURRARD STREET
Vancouver , British Columbia
- Issued
- Issued Dec 08, 2021
- Project type
- Renovation
- Value
- $315K
- Status
- Issued
Activity at this address
2 permits since 2021
Most recent activity: Dec 2022
Renovation
This permit is one of 2 permits filed at this address.
Permit details
The municipal record for this permit.
Trades
Electrical
Framing / Foundation
HVAC
Plumbing
Windows & Doors
- Issue date
- Dec 08, 2021
- Project value
- $315K
- Project type
- Renovation
- Building type
- Commercial
- Commercial category
- Retail
- Description
- High Density Housing / Commercial - Addition / Alteration - Interior alterations to change the use and change of major occupancy from ancillary hotel storage on ground floor and elevator lobby (Group C) on mezzanine floor to be used and as part of the operation of the existing Retail Store (Louis Vuitton - Group E) in this existing Municipally Designated Heritage 'M' Vancouver Hotel Building on this site. Scope of work: Convert hotel baggage area & elevator lobby to retail shell for future TI, resize existing elevator lobby at mezzanine, relocate annunciator panel, infill walls at elevator lobby on mezzanine level. Electrical, plumbing, sprinkler and fire alarm to suit. ******THIS PERMIT HAS BEEN ISSUED AND REVIEWED UNDER THE REQUIREMENTS OF VBBL 2019 ******** Rev. #1 - C. Fong - Sept 21, 2022 - Convert a portion of existing corridor on the main floor to a new back-of-house office ancillary to the existing hotel by a fire separation of 2h F.R.R. non-load-bearing walls. - Relocate door M007A in retail shell space. - Revise door M007B location along the host wall. - New lighting and mechanical grille in ancillary office. - Project value increased by $15,000. Building Review Branch Notes: 1. Ok for BP only per R. Astorino on July 20, 2021. 2. Sch-A, Arch. B, Struct. B, Elec. B, Mech. B & Plumb. B. are submitted. 3. Part 11 design upgrade levels Per Minor Renovation: 'F1’, ‘S2’, ‘N1’, ‘A2’ & ‘E2’. 4. Separate TI permit is required for interior renovations in the retail shell spaces. 5. Written assurance from Architect confirming the proposed scope of works do not require variance to the accepted alternative solution (AL400181) is submitted.
- Contractor
- Francis Wong DBA: IBI Group Architects Inc
- Permit status
- Issued
References & corrections IDs · source · attribution
Permit ID
BP-2021-04210
Full address
730 Burrard St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from Francis Wong DBA: IBI Group Architects Inc
26 other permits on record.