Renovation permit
333 DUNSMUIR STREET
Vancouver , British Columbia
- Issued
- Issued Oct 12, 2022
- Project type
- Renovation
- Value
- $4.3M
- Status
- Issued
Activity at this address
16 permits since 2017
Most recent activity: Mar 2025
Renovation
This permit is one of 16 permits filed at this address.
Permit details
The municipal record for this permit.
- Issue date
- Oct 12, 2022
- Project value
- $4.3M
- Project type
- Renovation
- Building type
- Commercial
- Commercial category
- Office
- Description
- Field Review - Addition / Alteration - 18th Floor - (Full Floor Tenant - BC Hydro) Interior alterations to provide tenant improvements for the existing office tenant on the 18th floor in this existing commercial building on this site. Scope of work: Demolish partition walls, remove ramps, handrails, raised floors, existing millwork, lobby finishes and ceiling. Remove existing fixtures/finishes in existing washrooms. Construct new walls for new office layout, new flooring and new glass support and ramp, HVAC, interior seismic upgrades, electrical, plumbing and sprinkler work. Letters of Assurance submitted: Schedule A by Branislav Cvijetinovic, Architect, AIBC., 236.330.3390 Architectural Schedule B by Glenn Roethlingshoefer, Architect, AIBC., 604.631.4544 Structural Schedule B by Aidin Yazdani Zonouz, P.Eng., 604.662.3555 Electrical Schedule B by Paul Singh, P.Eng., 604.662.3555 Plumbing/Mechanical Schedule B by M.T. Parsons, P.Eng., 403.210.3568 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Lighting - Upgrade to Local Control (per 9.4.1.1.(a) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
- Contractor
- PCL CONSTRUCTORS WESTCOAST INC
- Permit status
- Issued
- Applicant
- Asad Ijaz DBA: Construction Manager
References & corrections IDs · source · attribution
Permit ID
BP-2022-03795
Full address
333 Dunsmuir St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from PCL CONSTRUCTORS WESTCOAST INC
46 other permits on record.