Renovation permit
375 WATER STREET
Vancouver , British Columbia
- Issued
- Issued Nov 22, 2022
- Project type
- Renovation
- Value
- $1.4M
- Status
- Issued
Activity at this address
32 permits since 2018
Most recent activity: Jun 2026
Renovation
This permit is one of 32 permits filed at this address.
Permit details
The municipal record for this permit.
- Issue date
- Nov 22, 2022
- Project value
- $1.4M
- Project type
- Renovation
- Building type
- Commercial
- Commercial category
- Office
- Description
- Field Review - Addition / Alteration - #500 - 5th Floor (now #500 and #575 see Revision #1) Interior alterations to combine #500 and #575 (retaining #500) into an office shell space in this existing Municipally Designated Heritage B commercial building on this site. Scope of work: remove all non load bearing partition walls, millwork, fixtures, doors and frames to leave a shell space. REVISION #1: to demise #500 into two units to be #500 and #575 and to provide interior alterations to #575 for office (#500 to remain as shell). May 24, 2023 mlh REVISION #2: To reduce the area of suite #500 - demising the unit into 2 (to be #500 and #510). Unit #575 remain as is. Separate building permit for future improvement to #510. Change of Electrical Engineer from to P.Eng., Derek Hui - Nov 22/23 - LLL Separate permit required for future tenant improvement to #500 Letters of Assurance submitted by: Schedule A and Architectural Schedule B, P. Hoseini, AIBC. 604-681-5050 x102 Electrical Schedule B, C. Fontaine, P.Eng., 604-687-1800 x2026 Mechanical and Plumbing Schedule B, P. Richards, P.Eng., 604-687-1800 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - LIGHTING - UPGRADE TO INCORPORATE SCHEDULED SHUTOFF (PER 9.4.1.1(I) OF ASHRAE 90.1-2016) Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
- Contractor
- Kindred Construction Ltd
- Permit status
- Issued
- Applicant
- Parisa Seyed-Hoseini DBA: Cutler Architecture Ltd.
References & corrections IDs · source · attribution
Permit ID
BP-2022-04657
Full address
375 Water St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from Kindred Construction Ltd
48 other permits on record.