Renovation permit
675 W HASTINGS STREET
Vancouver , British Columbia
- Issued
- Issued Oct 05, 2022
- Project type
- Renovation
- Value
- $45K
- Status
- Issued
Activity at this address
16 permits since 2017
Most recent activity: Feb 2026
Renovation
This permit is one of 16 permits filed at this address.
Permit details
The municipal record for this permit.
Trades
Demolition
Electrical
Flooring
HVAC
Plumbing
Windows & Doors
General
Insulation
- Issue date
- Oct 05, 2022
- Project value
- $45K
- Project type
- Renovation
- Building type
- Commercial
- Commercial category
- Office
- Description
- Field Review - Addition / Alteration - #1100 - 11th Floor Interior alterations to provide tenant improvements for a new office tenant on the 11th floor (#1100) in this existing Municipally Designated Heritage "A" building on site. Scope of work: Demolish existing walls, doors and glazing. Relocate cabinets, doors and a portion of existing glass panel to meeting rooms, new carpet/tile flooring. Remove partition walls to create a staff lounge and an open kitchen. Electrical and plumbing work to suit. Revision #1: the condensate drainage piping from the heat pump will terminate indirectly over the mop sink in the Janitor's closet on Level 11 as indicated on Mechanical Drawing M-1.0 and M-3.0, the domestic water scope of work shown on M-3.0 has been removed, a Plumbing Letter regarding the removal of the plumbing scope has been provided. Jan. 31, 2023 mlh TENANT: Parkin Architects Western Ltd Letters of Assurance submitted: Schedule A and Architectural Schedule B F. Jamalifirouzabadi, Architect, AIBC. 778.317.2590 Electrical Schedule B by H. Kieu, P.Eng., 236.334.7215 Plumbing/Mechanical Schedule B by K.P. O'Neill, P.Eng., 416.443.8200 Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. E2 - Lighting - Upgrade to Restricted to Manual ON (per 9.4.1.1.(b) of ASHRAE 90.1-2016)\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage.
- Contractor
- FARSHAD JAMALIFIROUZABADI
- Permit status
- Issued
References & corrections IDs · source · attribution
Permit ID
BP-2022-03924
Full address
675 W Hastings St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.