New Build permit
2525 RENFREW STREET
Vancouver , British Columbia
- Issued
- Issued Sep 29, 2022
- Project type
- New Build
- Value
- $9.4M
- Status
- Issued
Activity at this address
2 permits since 2020
Most recent activity: Sep 2022
New Build
This permit is one of 2 permits filed at this address.
Permit details
The municipal record for this permit.
- Issue date
- Sep 29, 2022
- Project value
- $9.4M
- Project type
- New Build
- Building type
- Multi Family
- Description
- Certified Professional Program - New Building - To construct a 5-storey mixed-use building consisting of 1st storey - Retail use (shell only), Restaurant Class 1 (shell only), service rooms, loading and surface parking. 2nd to 5th storeys - residential dwelling units, all over 2 levels of below grade parking with vehicular access via lane. Re Total dwelling units = 37. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Building to be sprinklered to NFPA 13 requirements. Radio Antenna System to be installed in this building. Separate Tenant Improvement permits are required for all tenant spaces. STAGED CONSTRUCTION Stage 1 - Excavation and Shoring - September 29, 2022 Stage 2 - Foundation to Grade - issued Dec. 22/ 22 Stage 2 - Revision 1 - Revise foundation design at south property line to include micropiles. Addressing change to CRU fronting Renfrew St. - issued March 16, 2023 Stage 3 - Full Construction, minus commercial kitchen exhaust duct related scope - issued September 8, 2023 Revision 2 - Change of CRP and Architect from G.Williamson to T.Ankenman, effective September 29, 2023. - issued November 28, 2023 Stage 4 - Commercial kitchen exhaust duct related scope. - issued February 27, 2024 Revision 3 - Change of CRP and Architect from T.Ankenman to O.Struk, effective February 29, 2024. - issued March 18, 2024 Revision 4 - Change of CP, from J.Buscemi, P.Eng. to E.Watson-Hurthig, P.Eng. effective April 1, 2024. - issued March 26, 2024 Stage 3 - Revision 5 (Apr 07/25, A. Min): - Removed brick cladding from a portion of west exterior wall. - Replaced a lift in CRU 02 with an accessible ramp - Reflected Change of CRP & CP (Refer to Revision 3 & 4) & AL-2022-00155 to the drawings. - Installed an exit ramp in CRU 01 at its northeast exit door to eliminate a stepover.
- Contractor
- Pro-Can Construction Group Corp
- Permit status
- Issued
- Applicant
- Erik Watson-Hurthig DBA: Eriksberg Engineering Ltd.
References & corrections IDs · source · attribution
Permit ID
BP-2021-05578
Full address
2525 Renfrew St, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from Pro-Can Construction Group Corp
19 other permits on record.