Get emailed when we detect a status change on this permit.
Free for your first watch — no account needed. We'll email you a confirmation link; nothing is active until you click it.
New Build permit
2226 VANNESS AVENUE
Vancouver , British Columbia
- Issued
- Issued Sep 11, 2023
- Project type
- New Build
- Value
- $1.2M
- Status
- Issued
Activity at this address
3 permits since 2022
Most recent activity: Sep 2023
Demolition
This permit is one of 3 permits filed at this address.
Permit details
The municipal record for this permit.
- Issue date
- Sep 11, 2023
- Project value
- $1.2M
- Project type
- New Build
- Building type
- Single Family
- Description
- Low Density Housing - New Building - To construct a 2 storey single detached house with a secondary suite located in the Basement with a detached accessory building (garage) , at the rear providing 4 parking spaces, having vehicular access from the lane. The entire building to be sprinklered to NFPA 13D. As shown on the building permit floor plans and/or elevations, exit protection is required to be provided in accordance with Articles 9.9.4.4., 9.9.4.6., and/or 9.37.2.8. of the 2019 VBBL. NOTE: To achieve the required FSR a floor space exclusion of 2% has been applied to this application as per section 10.15.1 of the district schedule, to accommodate improved building performance. 1.\tCovenant registered at the Land Title Office under CB1200995 2.\tNo strata titling permitted 3.\tExternal mechanical unit proposed in rear yard 4.\tBar sink located in 5.\tSchedule B Tong Ngo P.Eng (604-372-2120) Architectural and Structural 6.\tSchedule B Thanh Van Le P.Eng (604-421-3288) Geotechnical 7.\tBC Housing MHR Homes Ltd Note: This is a 2 storey building pursuant to the Zoning and Development By-Law ******THIS PERMIT HAS BEEN ISSUED UNDER THE REQUIREMENTS OF VBBL 2019****** All rooms adjacent to East and West exposing building face shall be sprinklered. Combustible projections or roof soffits on an exposing building face shall not project to less than .45m from the property line and shall be in compliance with VBBL 2019 9.10.15.5.(9) Assigned Addressing: #1-2226 Vanness Av - One Family Dwelling (1st & 2nd floor, east portion of basement) #2-2226 Vanness Av - Secondary Suite (west portion of basement)
- Contractor
- MHR Homes Ltd
- Permit status
- Issued
- Applicant
- Bhupinder (Raj) Singh DBA: Raj Home Design
References & corrections IDs · source · attribution
Permit ID
DB-2021-06840
Full address
2226 Vanness Ave, Vancouver, BC, Vancouver
Page URL
Contains information licensed under the Open Government Licence, City of Vancouver.
CanPermits is not perfect.
Please correct us.
Nearby active addresses
Other addresses with recent permit activity near this permit.
More from MHR Homes Ltd
29 other permits on record.