Renovation permit

420 BEAVERDALE RD

Cambridge , Ontario

Issued
Issued Feb 17, 2026
Project type
Renovation
Status
Issued

Activity at this address

20 permits since 1994

Most recent activity: Feb 2026

Renovation

This permit is one of 20 permits filed at this address.

3 2 1 0 2010 2012 2014 2017 2018 2021 2025 2026
See everything happening at this address · 20 permits

Permit details

The municipal record for this permit.

Issue date
Feb 17, 2026
Project value
Project type
Renovation
Building type
Commercial category
Industrial
Description
This project involves correcting existing cross connection hazards and installing new, code compliant backflow prevention devices throughout the facility. 1. Install RP (Reduced Pressure) Assemblies on high hazard connections including: Boiler makeup water, lab dishwasher with chemical feed, Marielle Room (Steris sterilizer, Autoclave cooling lines, Jacket cooling lines for process tanks), Sprinkler Room (2- premise backflow, 3-gate valves), Non-sterile batching room, Pipette Cleaner (To be discussed with Jason and building manager), RO Generation (Main line to unit, Drain line on unit) (To be discussed with Jason and building manager), Drain cooling in RO Room, Hand Sprayer Safety Shower 2. Install HCVB (Hose Connection Vacuum Breakers) on all hose bibbs including: Janitor rooms, Lab/utility hose bibs, Outdoor hose bibs, Washdown areas 3. Install LFVB (Laboratory Faucet Vacuum Breakers) on lab faucets and fume hood stations. 4. Ensure Air Gaps (AG) are present and compliant for all eyewash stations and safety showers. 5. Remove or correct non compliant piping, including: Abandoned city water lines, Incorrectly labeled potable/non potable lines, Swing check valves on tank cooling lines 6. Add isolation valves and test ports where required for annual testing.
Permit status
Issued
Work type
This project involves correcting existing cross connection hazards and installing new, code compliant backflow prevention devices throughout the facility. 1. Install RP (Reduced Pressure) Assemblies on high hazard connections including: Boiler makeup water, lab dishwasher with chemical feed, Marielle Room (Steris sterilizer, Autoclave cooling lines, Jacket cooling lines for process tanks), Sprinkler Room (2- premise backflow, 3-gate valves), Non-sterile batching room, Pipette Cleaner (To be discussed with Jason and building manager), RO Generation (Main line to unit, Drain line on unit) (To be discussed with Jason and building manager), Drain cooling in RO Room, Hand Sprayer Safety Shower 2. Install HCVB (Hose Connection Vacuum Breakers) on all hose bibbs including: Janitor rooms, Lab/utility hose bibs, Outdoor hose bibs, Washdown areas 3. Install LFVB (Laboratory Faucet Vacuum Breakers) on lab faucets and fume hood stations. 4. Ensure Air Gaps (AG) are present and compliant for all eyewash stations and safety showers. 5. Remove or correct non compliant piping, including: Abandoned city water lines, Incorrectly labeled potable/non potable lines, Swing check valves on tank cooling lines 6. Add isolation valves and test ports where required for annual testing. · Plumbing Permit
References & corrections IDs · source · attribution
Permit ID 332831
Full address 420 Beaverdale Road, Cambridge, Ontario, N3H 5L8, Cambridge, N3H 5L8
Page URL

Contains information licensed under the Open Government Licence, City of Cambridge.