New Build permit

305 MILNER AVE

Toronto , Ontario

Issued
Issued Jul 20, 2023
Project type
New Build
Status
Completed

Activity at this address

219 permits since 1999

Most recent activity: May 2026

Office

This permit is one of 219 permits filed at this address.

15 10 5 0 2019 2020 2021 2022 2023 2024 2025 2026
See everything happening at this address · 219 permits
Permit No. 22 120624 BLD Currently completed

Revision history

4 revisions on file · 2022–2023

  1. Closed Rev 01 Issued Jul 20, 2023
    REVISION#1: ARCHITECTURALItem 1.0 A-110 `Fourth Floor Renovation Plans’1.1 Updated layout to reflect mechanical and electrical changes.ELECTRICALItem 1.1 E-100 `Existing and New Power Layout’E-200 `Li… Read full revision note

    REVISION#1: ARCHITECTURALItem 1.0 A-110 `Fourth Floor Renovation Plans’1.1 Updated layout to reflect mechanical and electrical changes.ELECTRICALItem 1.1 E-100 `Existing and New Power Layout’E-200 `Lighting/Life Safety Layout & Details’1.1 Delete power for the two 7.5ton AC units.1.2 Add power for one ductless split AC unit.1.3 Delete 125A 3p breaker for UPS unit.1.4 Add two 30A 2p breakers with twist lock receptacles for UPS units.1.5 Add 20A 1p breaker and 5-20 receptacle for UPS unit.1.6 Delete sprinkler compressor.1.7 Delete note regarding AC units and motorized dampers shutting down on firealarm.1.8 Delete 347/600A panel AA and all associated breakers.1.9 Add 100A 3p unfused disconnect and revise single line to suit.1.10 Delete work related to reinstating the generator and transfer switch. Intercept existing200A 600V feeder and extend to new Server Room location to feed new distribution. Add200A 3p main breaker into new panel AA.1.11 Intercept existing 200A utility power feed in ceiling of third floor existing Server Room. Ttapinto existing feed and run new 90-100A teck above ceiling. Run back to third floorelectrical closet C.1.12 Utilize spare sleeve and run up to fourth floor.1.13 Install 100/90A fuse in new Server Room.1.14 When the existing Server Room is de-energized, replace 200A fuses in distribution panelin third floor Electrical Closet C, with 100A fuses. Affix permanent label on distributionpanel to indicate `100A max’.Construct a new server room for Circle K

  2. Revision issued Rev 01 Issued Jul 20, 2023
    REVISION#1: ARCHITECTURALItem 1.0 A-110 `Fourth Floor Renovation Plans’1.1 Updated layout to reflect mechanical and electrical changes.ELECTRICALItem 1.1 E-100 `Existing and New Power Layout’E-200 `Li… Read full revision note

    REVISION#1: ARCHITECTURALItem 1.0 A-110 `Fourth Floor Renovation Plans’1.1 Updated layout to reflect mechanical and electrical changes.ELECTRICALItem 1.1 E-100 `Existing and New Power Layout’E-200 `Lighting/Life Safety Layout & Details’1.1 Delete power for the two 7.5ton AC units.1.2 Add power for one ductless split AC unit.1.3 Delete 125A 3p breaker for UPS unit.1.4 Add two 30A 2p breakers with twist lock receptacles for UPS units.1.5 Add 20A 1p breaker and 5-20 receptacle for UPS unit.1.6 Delete sprinkler compressor.1.7 Delete note regarding AC units and motorized dampers shutting down on firealarm.1.8 Delete 347/600A panel AA and all associated breakers.1.9 Add 100A 3p unfused disconnect and revise single line to suit.1.10 Delete work related to reinstating the generator and transfer switch. Intercept existing200A 600V feeder and extend to new Server Room location to feed new distribution. Add200A 3p main breaker into new panel AA.1.11 Intercept existing 200A utility power feed in ceiling of third floor existing Server Room. Ttapinto existing feed and run new 90-100A teck above ceiling. Run back to third floorelectrical closet C.1.12 Utilize spare sleeve and run up to fourth floor.1.13 Install 100/90A fuse in new Server Room.1.14 When the existing Server Room is de-energized, replace 200A fuses in distribution panelin third floor Electrical Closet C, with 100A fuses. Affix permanent label on distributionpanel to indicate `100A max’.Construct a new server room for Circle K

  3. Inspection Rev 00 Issued Jun 03, 2022

    Construct a new server room for Circle K

  4. Closed Rev 00 Issued Jun 03, 2022

    Construct a new server room for Circle K

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Jul 20, 2023
Project value
Project type
New Build
Building type
Commercial
Commercial category
Office
Description
REVISION#1: ARCHITECTURALItem 1.0 A-110 `Fourth Floor Renovation Plans’1.1 Updated layout to reflect mechanical and electrical changes.ELECTRICALItem 1.1 E-100 `Existing and New Power Layout’E-200 `Lighting/Life Safety Layout & Details’1.1 Delete power for the two 7.5ton AC units.1.2 Add power for one ductless split AC unit.1.3 Delete 125A 3p breaker for UPS unit.1.4 Add two 30A 2p breakers with twist lock receptacles for UPS units.1.5 Add 20A 1p breaker and 5-20 receptacle for UPS unit.1.6 Delete sprinkler compressor.1.7 Delete note regarding AC units and motorized dampers shutting down on firealarm.1.8 Delete 347/600A panel AA and all associated breakers.1.9 Add 100A 3p unfused disconnect and revise single line to suit.1.10 Delete work related to reinstating the generator and transfer switch. Intercept existing200A 600V feeder and extend to new Server Room location to feed new distribution. Add200A 3p main breaker into new panel AA.1.11 Intercept existing 200A utility power feed in ceiling of third floor existing Server Room. Ttapinto existing feed and run new 90-100A teck above ceiling. Run back to third floorelectrical closet C.1.12 Utilize spare sleeve and run up to fourth floor.1.13 Install 100/90A fuse in new Server Room.1.14 When the existing Server Room is de-energized, replace 200A fuses in distribution panelin third floor Electrical Closet C, with 100A fuses. Affix permanent label on distributionpanel to indicate `100A max’.Construct a new server room for Circle K
Builder name
Permit status
Completed City's exact wording: Closed
Work type
Building Additions/Alterations
Completed
2026-06-19
References & corrections IDs · source · attribution
Permit ID 22 120624 BLD
Full address 305 Milner Avenue, Toronto, Ontario, M1B 3C6, Toronto, M1B 3C6
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.

Nearby active addresses

Other addresses with recent permit activity near this permit.