Other permit

66 JUTLAND RD

Toronto , Ontario

Issued
Issued Oct 26, 2021
Project type
Other
Status
Issued

Activity at this address

84 permits since 2008

Most recent activity: Mar 2026

Office

This permit is one of 84 permits filed at this address.

24 16 8 0 2008 2020 2021 2022 2023 2024 2025 2026
See everything happening at this address · 84 permits
Permit No. 19 247847 PLB Currently issued

Revision history

7 revisions on file · 2020–2025

  1. Revision issued Rev 06 Issued Apr 04, 2025
    Revision - Wahsroom and plumbing fit out locations have been reivsed to suit units. Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION … Read full revision note

    Revision - Wahsroom and plumbing fit out locations have been reivsed to suit units. Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION 04: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  2. Revision issued Rev 05 Issued Dec 06, 2024
    Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION 04: The block originally had eight units, but we have decided to split three double … Read full revision note

    Rev 05 - Plumbing changes for Block A related to the submitted building with repairs/changes in the system.REVISION 04: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  3. Revision issued Rev 04 Issued Aug 24, 2023
    REVISION 04: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, … Read full revision note

    REVISION 04: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  4. Revision issued Rev 03 Issued Aug 24, 2023
    Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A … Read full revision note

    Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  5. Revision issued Rev 02 Issued Mar 22, 2022
    Revision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M… Read full revision note

    Revision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  6. Revision issued Rev 01 Issued Oct 26, 2021

    Revision 01: to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.

  7. Inspection Rev 00 Issued May 01, 2020
    Plumbing - The proposed development consists of 58 2-storey industrial/office units within 5 blocks with a total GFA of 11,523 square meters. A vehicular entrance is proposed on the south east side of… Read full revision note

    Plumbing - The proposed development consists of 58 2-storey industrial/office units within 5 blocks with a total GFA of 11,523 square meters. A vehicular entrance is proposed on the south east side of the site with ingress and egress from Jutland Road. Block A consists of 16 units.

Every revision the municipality has published for this permit, read directly off the source record rather than the single collapsed status most permit trackers show.

Issued / completed Application / inspection Cancelled / refused

Permit details

The municipal record for this permit.

Issue date
Oct 26, 2021
Project value
Project type
Other
Building type
Industrial
Commercial category
Industrial
Description
Revision 01: to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.
Permit status
Issued City's exact wording: Revision Issued
Work type
Plumbing(PS)
References & corrections IDs · source · attribution
Permit ID 19 247847 PLB
Full address 66 Jutland Road, Toronto, Ontario, M8Z 4P8, Toronto, M8Z 4P8
Page URL

Contains information licensed under the Open Government Licence, City of Toronto.